The proposed demolition works will involve, but are not limited to, the following items being demolished and removed from Area A shown on attached plan 11281-0001-04: 60m high stack, gas above ground installation, turbine hall, admin. block, water treatment plans and fuel oil tanks. Built elements within Area B are not to be demolished as part of this application