Skip to content

Land Adjoining 1 The Coppice, New Road, Saltwood

24/2016/FH/PAPrior approval Part 3 Class Q: Agricultural buildings to dwellinghousesApproved
Outline / PiP

Approved on 14 February 2025

Council decision: Approve with Conditions

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Determination as to whether the prior approval of the Local Planning Authority is required under Part 3 Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015 for the change of use and conversion of a agricultural building and associated land (as identified) into one (Class C3) dwelling

Received
24 December 2024
Ward
Hythe
  1. Received24 Dec
  2. Validated24 Dec
  3. Consult.29 Jan
  4. Target
  5. Decided14 Feb

Decided in 52 days (council typically 49)

About this application

This is an outline application for a change of use at LAND ADJOINING 1 THE COPPICE, NEW ROAD, SALTWOOD. Folkestone and Hythe has handled 423 applications of this type. This one was decided in 52 days, 3 days longer than Folkestone and Hythe's typical decision time. There are no previous applications recorded at this address. In the past year there have been 127 applications across Hythe.

77% of outline applications at Folkestone and Hythe District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Prior approval Part 3 Class Q: Agricultural buildings to dwellinghouses
Scale / size
Small
Parish
Saltwood

Planning application dates

Date validated
24 December 2024
Consultation expiry
29 January 2025
Consultation end
29 January 2025
Committee meeting
11 February 2025
Application expires
18 February 2025

Planning decision

Statutory period
56 days

Additional information

Documents
19

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

No recorded designations at this site.

Not published by this council, so not checked: Article 4 directions, tree preservation orders and brownfield registers. Ask the council if these matter.

Also checked, none recorded (7)

conservation areas, listed buildings, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens and SSSIs.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

Planning history at this site

1 other application at this property, newest first.

  1. 2023
    16 Aug

    Planning Permission in Principle for up to 4 dwellings

    RefusedPermission in Principle23/1366/FH/PIP

Source: Folkestone and Hythe

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused for changes of use on your street. Pick your home and get the evidence before you pay for drawings.