32 Maple Grove March Cambridgeshire PE15 8HT
Approved on 22 August 2023
Council decision: Permission Not RequiredDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Certificate of Lawful Use (Proposed): Erect a detached summer house to rear of existing dwelling
- Received
- 23 May 2023
- Decision level
- Delegated (officer decision)
- Council
- Fenland District Council
- Ward
- March North
- ReceivedReceived23 May
- ValidatedValidated27 Jun
- Consult.Consultation
- TargetTarget Date22 Aug
- DecidedDecided22 Aug
Decided in 56 days (council typically 70)
About this application
This is an outline application for an outbuilding at 32 Maple Grove March Cambridgeshire PE15 8HT. Fenland has handled 626 applications of this type. This one was decided in 91 days, 3 weeks longer than Fenland's typical decision time. There have been 2 other applications at this address. In the past year there have been 55 applications across March North. We hold 1,219 applications in total for the PE15 postcode area.
83% of outline applications at Fenland District Council were approved. Across all application types, the council typically decides in about 10 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- PE15 8HT
- Application type
- Certificate of lawfulness (Proposed use)
- Scale / size
- Small
- Parish
- March Town Council
Planning application dates
- Date validated
- 27 June 2023
- Target decision date
- 22 August 2023
Planning decision
- Statutory period
- 56 days
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
2 other applications at this property, newest first.
- 20186 Jun
Non-material amendment: overall reduction in size of extension, relating to F/YR17/1104/F
ApprovedNon-material amendmentF/YR18/0545/NONMAT - 201716 Nov
Erection of a single-storey rear extension to existing dwelling involving demolition of existing rear…
ApprovedFull Planning PermissionF/YR17/1104/F
Source: Fenland
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near PE15
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 32 Maple Grove March Cambridgeshire PE15 8HTF/YR18/0545/NONMAT · AmendmentApproved0.0 mi
- 32 Maple Grove March Cambridgeshire PE15 8HTF/YR17/1104/F · FullApproved0.0 mi
- 34 Maple Grove March Cambridgeshire PE15 8HTF/YR21/0435/F · FullApproved0.0 mi
- 22 Maple Grove March Cambridgeshire PE15 8HTF/YR24/0597/F · FullApproved0.0 mi
- 30 Acacia Grove March Cambridgeshire PE15 8HYF/YR18/0586/F · FullApproved0.0 mi
For applicants and trades
Contractors near this project
- Head Of Electrics LtdElectrician0.2 mi
- Greensmart Renewables LtdSolar Panel InstallerBattery Storage0.3 mi
- Solar Gateway LtdSolar Panel InstallerBattery Storage0.3 mi
- D J Smith Plumbing and HeatingSolid Fuel Heating0.3 mi
Planning something similar?
See what the council approved and refused for outbuildings and garden rooms on your street. Pick your home and get the evidence before you pay for drawings.