Land South West Of The Orchards Gull Road Guyhirn Cambridgeshire
Refused on 13 September 2018
Council decision: RefusePlanning committee
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Erection of up to 3 x dwellings (outline application with all matters reserved) including the formation of 3 x new accesses
- Received
- 5 July 2018
- Decision level
- Planning committee
- Public comments
- 7
- Council
- Fenland District Council
- Ward
- Parson Drove/Wisbech St Mary
- Agent
- Barker Parry Town Planning Ltd
- ReceivedReceived5 Jul
- ValidatedValidated13 Jul
- Consult.Consultation4 Sep
- TargetTarget Date7 Sep
- DecidedDecided13 Sep
Decided in 62 days (council typically 70)
About this application
This is an outline application at Land South West Of The Orchards Gull Road Guyhirn Cambridgeshire. Fenland has handled 626 applications of this type. This one was decided in 70 days. There have been 5 other applications at this address.
83% of outline applications at Fenland District Council were approved. Across all application types, the council typically decides in about 10 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Outline Planning Permission
- Scale / size
- Small
- Parish
- Wisbech St Mary Parish Council
Planning application dates
- Date validated
- 13 July 2018
- Consultation expiry
- 13 September 2018
- Consultation start
- 4 September 2018
- Consultation end
- 4 September 2018
- Neighbour consultation start
- 13 September 2018
- Neighbour consultation end
- 13 September 2018
- Last date for comments
- 13 September 2018
- Target decision date
- 7 September 2018
- Committee meeting
- 12 September 2018
Applicant and agent
- Agent
- Barker Parry Town Planning Ltd
- Agent address
- 33 Bancroft Hitchin Herts SG5 1LA
Planning decision
- Statutory period
- 56 days
Publicity
- Site notice start
- 7 August 2018
- Site notice end
- 28 August 2018
Additional information
- Planning Portal ID
- PP-07036996
- Documents
- 21
- Constraints
- 6
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
5 other applications at this property, newest first.
- 20243 Apr
Erect up to 4 x dwellings (outline application with all matters reserved)
RefusedOutline Planning PermissionF/YR24/0968/O - 202217 May
Erect 1x dwelling (3-storey 5-bed) and poly-tunnel
RefusedFull Planning PermissionF/YR22/0739/F - 20172 Oct
Erection of up to 5no dwellings (Outline with all matters reserved)
RefusedOutline Planning PermissionF/YR17/0974/O - 20177 Mar
Erection of up to 7no dwellings (Outline with all matters reserved)
RefusedOutline Planning PermissionF/YR17/0203/O - 201629 Nov
Erection of 7no dwellings (Outline with all matters reserved)
WithdrawnOutline Planning PermissionF/YR16/1157/O
Source: Fenland
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Land South West Of The Orchards Gull Road Guyhirn CambridgeshireF/YR22/0739/F · FullRefused0.0 mi
- Land North East Of Hazeldene Gull Road Guyhirn CambridgeshireF/YR19/0861/O · OutlineRefused0.0 mi
- Land South West Of The Orchards Gull Road Guyhirn CambridgeshireF/YR17/0203/O · OutlineRefused0.0 mi
- Land South West Of The Orchards Gull Road Guyhirn CambridgeshireF/YR16/1157/O · OutlineWithdrawn0.0 mi
- Land South West Of The Orchards Gull Road Guyhirn CambridgeshireF/YR17/0974/O · OutlineRefused0.0 mi
For applicants and trades
Consultants on this application
- Barker Parry Town Planning Limited · Agent for this application
Contractors near this project
- Anglia Electrical Installations LtdElectrician0.9 mi
- J P & Son Electrical ContractorsElectrician1.2 mi
- Solar Savings 4U LtdElectrician3.2 mi
- Hinson ElectricalElectrician3.5 mi
Planning something similar?
See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.