Land West Of 19 Silver Street March Cambridgeshire
Approved on 5 July 2016
Council decision: GrantDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Change of use of land to extend residential curtilage of 19 Silver Street
- Received
- 2 March 2016
- Decision level
- Delegated (officer decision)
- Public comments
- 3
- Council
- Fenland District Council
- Ward
- March North
- Agent
- KL Elener Architectural Design
- ReceivedReceived2 Mar
- ValidatedValidated10 May
- Consult.Consultation14 Apr
- TargetTarget Date5 Jul
- DecidedDecided5 Jul
Decided in 56 days (council typically 70)
About this application
This is a full planning application for a change of use at Land West Of 19 Silver Street March Cambridgeshire. Fenland has handled 2,964 applications of this type. This one was decided in 125 days, 8 weeks longer than Fenland's typical decision time. There are no previous applications recorded at this address. In the past year there have been 55 applications across March North.
90% of full applications at Fenland District Council were approved. Across all application types, the council typically decides in about 10 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Planning Permission
- Scale / size
- Small
- Parish
- March Town Council
Planning application dates
- Date validated
- 10 May 2016
- Consultation expiry
- 5 July 2016
- Consultation start
- 24 March 2016
- Consultation end
- 14 April 2016
- Neighbour consultation start
- 5 July 2016
- Neighbour consultation end
- 5 July 2016
- Last date for comments
- 5 July 2016
- Target decision date
- 5 July 2016
- Permission expires
- 5 July 2019
Applicant and agent
- Agent
- KL Elener Architectural Design
- Agent address
- Office 4 Regent Buildings Office Suite 6-8 Dartford Road March Cambs PE15 8AQ
Planning decision
- Statutory period
- 56 days
Additional information
- Planning Portal ID
- PP-04877787
- Documents
- 21
- Constraints
- 4
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
1 other application at this property, newest first.
Source: Fenland
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- 19 Silver Street March Cambridgeshire PE15 8QGF/YR26/0120/F · FullApproved0.0 mi
- Plot 1 Land South East Of 12 Silver Street March CambridgeshireF/YR10/0016/NONMAT · AmendmentApproved0.0 mi
- Land East Of Silver Street March CambridgeshireF/YR10/0410/EXTIME · AmendmentApproved0.0 mi
- Land East Of 19 Silver Street March CambridgeshireF/YR26/0122/VOC · ConditionsApproved0.0 mi
- Land East Of 19 Silver Street March CambridgeshireF/YR24/0587/RM · OutlineApproved0.0 mi
For applicants and trades
Contractors near this project
- Tradelink Installations LimitedWindow & Door Installer0.4 mi
- DSP Electrical LtdElectrician0.5 mi
- Head Of Electrics LtdElectrician0.5 mi
- Principle Construction And Maintenance LtdMarchConstructionRenovation0.6 mi
Planning something similar?
See what the council approved and refused for changes of use on your street. Pick your home and get the evidence before you pay for drawings.