Land South East Of 1 Station Approach March Cambridgeshire
Approved on 22 February 2016
Council decision: GrantDelegated (officer decision)
Proposal
Works to an Ash tree covered by TPO14/1988
- Received
- 8 December 2015
- Decision level
- Delegated (officer decision)
- Public comments
- 2
- Council
- Fenland District Council
- Ward
- March North
- ReceivedReceived8 Dec
- ValidatedValidated4 Jan
- Consult.Consultation28 Jan
- TargetTarget Date29 Feb
- DecidedDecided22 Feb
Decided in 49 days (council typically 70)
About this application
This is a tree application at Land South East Of 1 Station Approach March Cambridgeshire. Fenland has handled 557 applications of this type. This one was decided in 76 days, 6 days longer than Fenland's typical decision time. The site is in 1 listed building nearby. There are no previous applications recorded at this address. In the past year there have been 55 applications across March North.
92% of trees applications at Fenland District Council were approved. Across all application types, the council typically decides in about 10 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Works to trees protected by a TPO
- Scale / size
- Small
- Parish
- March Town Council
Planning application dates
- Date validated
- 4 January 2016
- Consultation expiry
- 28 January 2016
- Consultation start
- 7 January 2016
- Consultation end
- 28 January 2016
- Last date for comments
- 28 January 2016
- Target decision date
- 29 February 2016
- Decision issued
- 26 February 2016
- Permission expires
- 26 February 2018
Planning decision
- Statutory period
- 56 days
Additional information
- Documents
- 9
- Constraints
- 1
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Fenland
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- 3 Station Approach March Cambridgeshire PE15 8SJF/YR14/3110/COND · ConditionsWithdrawn0.0 mi
- 3 Station Approach March Cambridgeshire PE15 8SJF/YR14/0209/F · FullApproved0.0 mi
- 212 Station Road March Cambridgeshire PE15 8SQF/YR26/0261/DE1 · OtherApproved0.0 mi
- 212 Station Road March Cambridgeshire PE15 8SQF/YR26/0175/F · FullAwaiting decision0.0 mi
- 212 Station Road March Cambridgeshire PE15 8SQF/YR25/0709/DE1 · OtherApproved0.0 mi
For applicants and trades
Contractors near this project
- Head Of Electrics LtdElectrician0.3 mi
- Tradelink Installations LimitedWindow & Door Installer0.4 mi
- DSP Electrical LtdElectrician0.5 mi
- Greensmart Renewables LtdSolar Panel InstallerBattery Storage0.6 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.