Skip to content

7, Kendal Avenue, N18 1NE

26/02909/FULFull planning permissionRefused
Full

Proposal

Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear extension, rear dormer, front roof lights, with associated amenity, cycle and refuse storage.

Received
19 August 2026
Decided
7 October 2026
Ward
Bedlington East
Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

  1. Received19 Aug
  2. Validated17 Aug
  3. Consult.
  4. Target
  5. Decided7 Oct

Decided in 51 days (council typically 49)

7 weeks typical decision time in Enfield70% of full planning permission applications approved

This is a planning application for a single storey rear extension at 7, Kendal Avenue, N18 1NE. Enfield has handled 1,063 applications of this type and approves 70% of them, typically deciding them in 55 days. This one was decided in 49 days, 6 days quicker than Enfield's median. The site is in a conservation area. There have been 2 other applications at this address. In the past year there have been 125 applications across Haselbury. We hold 646 applications in total for the N18 postcode area.

Application Details

Reference
26/02909/FUL
Address
7, Kendal Avenue, N18 1NE
Postcode
N18 1NE
Local Authority
Enfield
Application Type
Full planning permission
Decision Status
Rejected
Ward
Bedlington East
Parish
East Bedlington

Applicant & Agent

Planning Application Dates

Date Received
17 August 2026
Date Decided
7 October 2026
Date Validated
17 August 2026
Date Submitted
19 August 2026

Planning Decision

Case Officer
Ben Briggs

Why it was refused

  1. The HMO by reason of its limited communal kitchen space layout as well as limited natural lighting to Rooms 2 and 3, would represent a substandard and inappropriate form of accommodation which would not be capable of meeting the reasonable needs of its occupiers and would be detrimental to the standard of living of the occupants. In addition, the layout of the property including its detached rear garage that is served by a rear alley could be put to better use by a single family dwelling in line with the existing arrangement, rather than an HMO and this would detract from the character of the setting. The scheme therefore fails to provide an adequate standard of residential accommodation and it is contrary to Policy D6 of the London Plan (2021), Core Strategy Policies CP4 and CP30, Development Management Document Policies DMD5, DMD7 and DMD37 as well as the NPPF (2026).
  2. The proposed rear dormer by virtue of its design, scale, siting and dimensions would give rise to a contrived, cluttered and bulky form of roof extension that would be detrimental to the character and appearance of the building and visual amenities of Kendal Avenue. Additionally, the dormer would create additional bulk to the roofscape to represent a dominant and incongruous addition and awkward relationship with the parent roofslope, thereby both unbalancing and detracting from the character and symmetry of the prevailing build form within the street scene. The proposals are thereby contrary to Policy D3 of the London Plan (2021), CP30 of the Core Strategy, DMD13 and DMD37 of the Development Management Document and the advice contained within the NPPF (2026).

From the council's decision notice.

Publicity

Appeal

Additional Information

Documents
16
Coordinates
51.617126, -0.084947
Enriching application data
2/3
Council recordsAppealsFlood risk

Source: Enfield

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near N18

New planning applications delivered to your inbox weekly.

Planning constraints

Designations that overlap or adjoin the site outline.

  • Article 4 direction: Borough wide
  • Flood zone 1: Low probability (rivers and sea)

Possibly incomplete for this council: tree preservation orders.

Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-10-09. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report