Skip to content

M25 Junction 25 To Junction 26

25/03509/DCOApproval of details reserved by a condition (discharge)Approved
Discharge / amendments

Approved on 6 November 2025

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Details submitted to Discharge Schedule 2, Requirement 3 (written scheme-stages of construction) in relation to the National Grid (north London reinforcement project) Order 2014.

Submitted
9 October 2025
  1. Received9 Oct
  2. Validated
  3. Consult.
  4. Target
  5. Decided6 Nov

Decided in 28 days (council typically 49)

About this application

This is a planning application at M25 Junction 25 To Junction 26. Enfield has handled 419 applications of this type. This one was decided in 28 days, 3 weeks quicker than Enfield's typical decision time. The site is in a conservation area. There have been 3 other applications at this address. In the past year there have been 39 applications across Enfield Lock.

81% of approval of details reserved by a condition (discharge) applications at London Borough of Enfield were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Approval of details reserved by a condition (discharge)

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)Part of the site
  • Article 4 direction: Borough widePart of the site
  • Green belt: EnfieldPart of the site · +1 more

Possibly incomplete for this council: tree preservation orders.

Also checked, none recorded (21)

flood storage areas, conservation areas, listed buildings, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Planning history at this site

11 other applications at this property, newest first.

  1. 2026
    6 Oct

    Details submitted to discharge schedule 2, Requirement 3 Written scheme setting out all stages of the…

    PendingDischarge of conditions26/04259/DCO
  2. 2026
    8 Jul

    Details submitted to discharge Schedule 2, requirement 9 (1) (Stage 2a) Construction Traffic Management Plan…

    WithdrawnDischarge of conditions26/02885/DCO
  3. 2026
    11 Jun

    Details submitted to discharge schedule 2, Requirement 10 - Surface Water Drainage [Stage 5d] in relation to…

    ApprovedDischarge of conditions26/02480/DCO
  4. 2026
    8 Jun

    Details submitted to Discharge Schedule 2, Requirement 14 - Archaeology [Stage 5d] in relation to the…

    ApprovedDischarge of conditions26/02387/DCO
  5. 2026
    8 Jun

    Details submitted to discharge schedule 2, Requirement 12 (Stage 5d)- Ecological Management Plan in relation…

    ApprovedDischarge of conditions26/02388/DCO
  6. 2026
    12 Mar

    Details submitted to Discharge Schedule 2, Requirement 11 - Contaminated Land and Groundwater [Stage 5d] in…

    ApprovedDischarge of conditions26/00969/DCO

Source: Enfield

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.