Cedar House Mill Road Cobham Surrey KT11 3AL
Approved on 10 September 2025
Council decision: Grant Planning PermissionPlanning committee
Proposal
Variation of Conditions: 2 (Approved Plans) 3 (Materials) 5 (Tree Planting and Maintenance) 6 (Archaeology Watching Brief) 12 (Obscure Glazing) and Removal of Conditions 4 (Tree Pre-commencement Meeting), 22 (BS8233:2014 Guidance on Sound Insulation and Noise Reduction for Buildings) and 23 (BS4142:2019 Methods for Rating and Assessing Industrial and Commercial Sound) of planning permission 2021/3348 (Conversion of existing building with two-storey rear extension comprising three dwellings with associated landscaping and parking following part demolition of existing building) for internal and external amendments to House A, B and C to include (i) New pedestrian access in north boundary wall and closing off access to funeral directors to east (ii) Removal of approved internal stair and reinstatement of original spiral staircase (iii) Provision of glazed fire doors beneath balcony to House B (iv) Provision of new fire surround to fireplace in hall (v) Closing off of window WB10 (vi) Provision of fire lobby and ensuite/bath to bedroom in House B (vii) Internal alterations to House A including retention/ boxing in of original fireplaces in rooms G.03 and S.03, removal of nibs to room F.02 and provision of en-suite W/C shower to Room S.02 (viii) Retention of outbuilding in SE corner in connection with provision of gas to original part of the building (ix) Relocation of existing ASHP to side of garage (x) Provision of doors to garden at House C and new window above (xi) Retention of outbuilding on the NW inset corner, (xii) New door to east elevation (xiii) Light cleaning and restoration of stone tracing window.
- Received
- 29 April 2025
- Decision level
- Planning committee
- Council
- Elmbridge Borough Council
- Ward
- Cobham and Downside Ward
- ReceivedReceived29 Apr
- ValidatedValidated27 May
- Consult.Consultation21 Aug
- TargetTarget Date16 Sep
- DecidedDecided10 Sep
Decided in 106 days (council typically 63)
About this application
This is an application to vary a condition at Cedar House Mill Road Cobham Surrey KT11 3AL. Elmbridge has handled 1,285 applications of this type. This one was decided in 134 days, 10 weeks longer than Elmbridge's typical decision time. The site is in the Cobham conservation area, with 4 listed buildings nearby. There have been 20 other applications at this address. In the past year there have been 125 applications across Cobham and Downside Ward. We hold 2,500 applications in total for the KT11 postcode area.
85% of conditions applications at Elmbridge Borough Council were approved. Across all application types, the council typically decides in about 9 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- KT11 3AL
- Application type
- Variation of Condition Under S73
- Scale / size
- Medium
Planning application dates
- Date validated
- 27 May 2025
- Consultation expiry
- 21 August 2025
- Consultation start
- 13 June 2025
- Consultation end
- 21 August 2025
- Target decision date
- 16 September 2025
- Committee meeting
- 10 September 2025
Planning decision
- Statutory period
- 112 days
Additional information
- Documents
- 94
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 2: Medium probability (rivers and sea)
- Conservation area: Cobham
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (20)
flood storage areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202529 Apr
Variation of Conditions: 2 (Approved Plans) 3 (Materials) 5 (Tree Planting and Maintenance) 6 (Archaeology…
This applicationApprovedVariation of conditions (s73)2025/1151 - 202414 Nov
Confirmation of Compliance with Condition 5 (Tree Planting and Maintenance) of planning permission 2021/3348
Condition(s) - Confirm ComplianceDischarge of conditions2024/2960 - 20244 Sep
Confirmation of Compliance with Condition: 3 (Material samples) of planning permission 2021/3348
Condition(s) - Confirm ComplianceDischarge of conditions2024/2333 - 20242 Sep
Confirmation of Compliance with Condition: 5 (Tree planting and maintenance) and 13 (Revised landscaping plan…
WithdrawnDischarge of conditions2024/2308 - 202431 Jul
Confirmation of Compliance with Conditions: 4 (Tree Pre-commencement Meeting) and 6 (Archaeology watching…
Condition(s) - Confirm ComplianceDischarge of conditions2024/2072 - 202122 Sep
Conversion of existing building with two-storey rear extension comprising three dwellings with associated…
ApprovedFull ApplicationPart of2021/3348 - 202122 Sep
Listed Building Consent: Conversion of existing building with two-storey rear extension comprising three…
ApprovedListed building consentRelated2021/3380
Planning history at this site
17 other applications at this property, newest first.
- 202610 Sep
Listed Building Consent: Retention of works to House B comprising structural strengthening works within the…
PendingListed building consent2026/2127 - 202626 May
Confirmation of Compliance with Condition: 7 (Reflected Ceiling and Floor Finishes) of planning permission…
PendingDischarge of conditions2026/1250 - 202621 May
Confirmation of Compliance with Conditions: 7 (Sensitive lighting), 8 (Bat access tiles), 13 (Revised…
PendingDischarge of conditions2026/1224 - 202522 Dec
Confirmation of Compliance with Condition: 10 (Repair of stone tracery window) of planning permission…
Condition(s) - Confirm ComplianceDischarge of conditions2025/3382 - 202528 Apr
Listed Building Consent: Increase depth of existing basement by 800mm to enable use as habitable…
ApprovedListed building consent2025/1127 - 202426 Nov
Listed Building Consent: Brick repair to existing facades.
ApprovedListed building consent2024/3060 - 202426 Nov
Listed Building Consent: Treatment and oil finish to internal exposed timbers.
ApprovedListed building consent2024/3058 - 202426 Nov
Listed Building Consent: Replacement of flat roof and roof repairs including replacement of tiles.
ApprovedListed building consent2024/3059 - 202426 Nov
Listed Building Consent for the retention of DOFF cleaning to the roof and soda blasting to historic internal…
ApprovedListed building consent2024/3057 - 202413 Nov
Confirmation of Compliance with Condition: 7 (Reflected ceiling and floor finishes) of planning permission.
Condition(s) - Confirm ComplianceDischarge of conditions2024/2955 - 202413 Nov
Confirmation of Compliance with Condition: 6 (New windows and doors) of planning permission 2021/3380
Condition(s) - Confirm ComplianceDischarge of conditions2024/2954 - 202417 Oct
Confirmation of Compliance with Condition 5 (Fire suppression measures) of planning permission 2021/3380
Condition(s) - Confirm ComplianceDischarge of conditions2024/2707 - 202430 Aug
Confirmation of Compliance with Condition 6 (New windows and doors) and 7(Reflected ceiling and floor…
WithdrawnDischarge of conditions2024/2287 - 20248 Aug
Confirmation of Compliance with Condition 9 (Roof construction details) of planning permission 2021/3380
Condition(s) - Confirm ComplianceDischarge of conditions2024/2115 - 201914 Oct
Cobham Conservation Area - Crown reduce 1 x Horse Chestnut by 3m.
ApprovedTree Conservation Area2019/2913 - 201923 Sep
Confirmation of Compliance with Condition: 4 (Window Details) of planning permission 2019/1800
ConditionsDischarge of conditions2019/2673 - 20191 Jul
Listed Building Consent: Alterations to fenestration and internal alterations including new flooring…
ApprovedListed building consent2019/1800
Source: Elmbridge
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near KT11
New planning applications delivered to your inbox daily.
Around this site
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Cobham Electrical Contractors LtdElectrician0.4 mi
- White Electrical Installations LtdElectrician0.4 mi
- D Sash Windows LtdWindow & Door Installer0.5 mi
- North South Windows LtdWindow & Door Installer0.5 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.