East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
Approved on 10 December 2025
Council decision: Application PermittedDelegated (officer decision)
Proposal
Discharge of Requirement 18(1) and (2) (Contaminated Land Mitigation Scheme) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
- Received
- 15 October 2025
- Decision level
- Delegated (officer decision)
- Public comments
- 3
- Council
- East Suffolk Council
- Ward
- Woodbridge
- ReceivedReceived15 Oct
- ValidatedValidated15 Oct
- Consult.Consultation11 Nov
- TargetTarget Date10 Dec
- DecidedDecided10 Dec
Decided in 56 days (council typically 56)
About this application
This is an application to discharge conditions at East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk. East Suffolk has handled 1,341 applications of this type. This one was decided in 56 days. There have been 4 other applications at this address. In the past year there have been 71 applications across Woodbridge.
99% of conditions applications at East Suffolk Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Discharge of Requirements (56 days)
- Scale / size
- Small
- Parish
- Woodbridge
Planning application dates
- Date validated
- 15 October 2025
- Last date for comments
- 11 November 2025
- Target decision date
- 10 December 2025
Planning decision
- Statutory period
- 56 days
Additional information
- Documents
- 9
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202521 Oct
Discharge of Requirement 22 (Code of Construction Practice) Onshore Cable Stage of East Anglia TWO Offshore…
ApprovedDischarge of conditionsFiled alongsideDC/25/4060/DRR - 202517 Oct
Discharge of Requirement 22(2)(h) (Pollution Prevention and Response Plan) Onshore Cable Stage of East Anglia…
ApprovedDischarge of conditionsFiled alongsideDC/25/4014/DRR - 202515 Oct
Discharge of Requirement 18(1) and (2) (Contaminated Land Mitigation Scheme) Onshore Cable Stage of East…
This applicationApprovedDischarge of conditionsDC/25/4005/DRR
Planning history at this site
2 other applications at this property, newest first.
- 202512 Dec
Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East…
PendingDischarge of conditionsDC/25/4828/CCC - 202512 Dec
Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind…
PendingDischarge of conditionsDC/25/4827/DRR
Source: East Suffolk
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston SuffolkDC/25/4014/DRR · ConditionsApproved0.0 mi
- East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston SuffolkDC/25/4060/DRR · ConditionsApproved0.0 mi
- East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston SuffolkDC/25/4006/DRR · ConditionsApproved0.0 mi
- East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston SuffolkDC/25/4004/DRR · ConditionsApproved0.0 mi
- 4 Church Walls Church Path Friston Saxmundham Suffolk IP17 1PXDC/25/3843/FUL · FullAwaiting decision0.1 mi
For applicants and trades
Contractors near this project
- R W Curle Electrical Contractors LtdElectrician1.3 mi
- Fellowes Electrical LtdElectrician1.4 mi
- Linsell ElectricalElectrician1.6 mi
- J T Pegg and Sons LtdSolid Fuel Heating1.9 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.