Bridlington House Bessingby Industrial Estate Bessingby Way Bridlington East Riding Of Yorkshire

22/01632/PLFFull Planning PermissionApproved
Full

Approved on 27 October 2022

Council decision: ApproveDelegated (officer decision)

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Sub division of existing warehouse, installation of new external roller shutter doors, personnel doors and new cladding infill to match existing and creation of concrete hardstanding and extension to vehicular access

Received
13 May 2022
Decision level
Delegated (officer decision)
Public comments
7
Ward
Bridlington South
  1. Received13 May
  2. Validated19 May
  3. Consult.14 Jul
  4. Target27 Oct
  5. Decided27 Oct

Decided in 161 days (council typically 56)

About this application

This is a full planning application for an extension at Bridlington House Bessingby Industrial Estate Bessingby Way Bridlington East Riding Of Yorkshire. East Riding has handled 8,922 applications of this type. This one was decided in 167 days, 16 weeks longer than East Riding's typical decision time. There are no previous applications recorded at this address. In the past year there have been 35 applications across Bridlington South.

91% of full applications at East Riding of Yorkshire Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Full Planning Permission
Scale / size
Medium
Parish
Bridlington Town Council

Planning application dates

Date validated
19 May 2022
Consultation expiry
14 July 2022
Consultation end
14 July 2022
Last date for comments
14 July 2022
Target decision date
27 October 2022

Planning decision

Statutory period
161 days

Publicity

Site notice end
24 June 2022

Additional information

Planning Portal ID
PP-11236887
Documents
21
Constraints
7

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 2: Medium probability (rivers and sea)Part of the site
Also checked, none recorded (24)

flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: East Riding

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused for changes of use on your street. Pick your home and get the evidence before you pay for drawings.