Land South Of Meeting Lane Lympstone
Approved on 24 October 2025
Council decision: Approval with conditionsPlanning committee
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Reserved matters application for layout, scale, appearance and landscaping for the erection of up to 42 dwellings, affordable housing and associated infrastructure and the discharge of conditions 4 (drainage output), 6 (drainage design), 7 (lighting impact assessment), 8 (LEMP), 9 (Tree Protection and Arb Method Statement), 14 (foul drainage) pursuant to outline application 24/0301/MOUT at Land South of Meeting Lane, Lympstone.
- Received
- 27 May 2025
- Decision level
- Planning committee
- Public comments
- 26
- Council
- East Devon District Council
- Ward
- Woodbury And Lympstone
- Agent
- Grainge Architects
- ReceivedReceived27 May
- ValidatedValidated27 May
- Consult.Consultation1 Oct
- TargetTarget Date
- DecidedDecided24 Oct
Decided in 150 days (council typically 49)
About this application
This is an outline application at Land South Of Meeting Lane Lympstone. East Devon has handled 467 applications of this type. This one was decided in 150 days, 14 weeks longer than East Devon's typical decision time. There have been 3 other applications at this address. In the past year there have been 80 applications across Woodbury And Lympstone.
77% of outline applications at East Devon District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Application type
- Major - Reserved Matters app.
- Scale / size
- Large
- Number of dwellings
- 42
- Parish
- Lympstone
Planning application dates
- Date validated
- 27 May 2025
- Consultation expiry
- 4 June 2025
- Last date for comments
- 1 October 2025
Applicant and agent
- Agent
- Grainge Architects
- Architect profile
- GRAINGE ARCHITECTS LTD
- Agent address
- The Boat Shed Michael Browning Way EXETER EX2 8DD
Publicity
- Last advertised
- 4 June 2025
Additional information
- Planning Portal ID
- PP-13954045
- Documents
- 181
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
3 other applications at this property, newest first.
- 202627 May
Removal of the requirement for the payment of an off-site affordable housing contribution in Section 106…
PendingDischarge of conditions26/1036/V106 - 20267 Jan
Discharge of condition for 24/0301/MOUT
PendingDischarge of conditions26/0019/DOC - 20267 Jan
Discharge of bioversity gain plan for 24/0301/MOUT
PendingDischarge of conditions26/0023/DBG
Source: East Devon
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Land South Of Meeting Lane Lympstone26/0019/DOC · ConditionsAwaiting decision0.0 mi
- Land South Of Meeting Lane Lympstone26/0023/DBG · ConditionsAwaiting decision0.0 mi
- Land To The East Of Nutwell Road Lympstone26/1289/MOUT · OutlineAwaiting decision0.1 mi
- Land Adjacent To 21 Strawberry Hill Lympstone24/1277/DOC · ConditionsApproved0.2 mi
- 48 Jackson Meadow Lympstone Exmouth EX8 5GZ25/0936/CPL · OutlineApproved0.2 mi
For applicants and trades
Contractors near this project
- Dale Chadwick Carpentry & Construction LtdBuilderCarpenters1.2 mi
- Elite Electrical Devon LtdElectricianSolar Panel Installer1.3 mi
- Prostove (Woodstove Installation Specialists)Solid Fuel Heating1.4 mi
- Dartmoor Tree Surgeons LimitedTree Surgeons1.4 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report