Shotton Airfield
Approved on 25 November 2004
Planning committee
Proposal
Hangar & buildings & resurfacing of runway
- Received
- 1 July 2004
- Decision level
- Planning committee
- Council
- Durham County Council
- ReceivedReceived1 Jul
- ValidatedValidated1 Jul
- Consult.Consultation
- TargetTarget Date26 Aug
- DecidedDecided25 Nov
Decided in 147 days (council typically 56)
About this application
This is a full planning application at Shotton Airfield. Durham has handled 11,057 applications of this type. This one was decided in 147 days, 13 weeks longer than Durham's typical decision time. There are no previous applications recorded at this address.
95% of full applications at Durham County Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Planning Application
- Scale / size
- Small
- Parish
- Shotton
Planning application dates
- Date validated
- 1 July 2004
- Target decision date
- 26 August 2004
- Committee meeting
- 23 November 2004
Planning decision
- Statutory period
- 56 days
Additional information
- Documents
- 0
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Durham
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- The Airfield Shotton Colliery Dh6 2nh5/PL/2009/0200 · FullApproved0.0 mi
- Shotton Primary School Grange Terrace Shotton Colliery5/PLAN/2006/0905Approved0.0 mi
- Shotton Colliery Primary School Grange Terrace Shotton5/HIST/2003/0605Approved0.0 mi
- Shotton Primary School, Grange Terrace, Shotton Colliery8/928/5/109(3) · OtherApproved0.0 mi
- Telecommunications Mast Peterlee Parachute Centre Shotton Colliery DH6 2NH5/CD/2011/0035 · ConditionsApproved0.0 mi
For applicants and trades
Contractors near this project
- Stephen Lamb GroupConservatoriesWindow & Door Installers0.7 mi
- JLT Electrical Contractors LimitedElectrician0.9 mi
- P & P Windows LtdWindow & Door Installer1.0 mi
- J & L Welch Roofing & Paving Services LtdRoofers1.0 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.