Skip to content

Land At Minsca Wind Farm Risp Hill Near Bankshill Lockerbie

26/2143/PANAwaiting decision

Proposal

PROPOSAL OF APPLICATION NOTICE FOR REPOWERING OF MINSCA WIND FARM, COMPRISING THE DECOMMISSIONING AND REMOVAL OF THE 16 EXISTING WIND TURBINES AND THE ERECTION OF UP TO 5 NEW WIND TURBINES (MAXIMUM BLADE TIP HIGHT 200 METRES), TOGETHER WITH ASSOCIATED INFRASTRUCTURE INCLUDING ACCESS TRACKS, BORROW PITS, ANEMOMETER AND LiDAR, CRANE HARDSTANDINGS, UNDERGROUND CABLING, SUBSTATION AND CONTROL BUILDING AND TEMPORARY CONSTRUCTION COMPOUNDS

Site boundary (council red line)
Received
26 November 2026
  1. Received26 Nov
  2. Validated26 Nov
  3. Consult.
  4. Target
  5. Decided

About this application

This is a planning application at Land At Minsca Wind Farm Risp Hill Near Bankshill Lockerbie. Dumfries has handled 4,035 applications of this type. It has been with the council since 26 November 2026 and is still awaiting a decision. There are no previous applications recorded at this address.

Flood & Drainage

Application details

Planning application dates

Date validated
26 November 2026

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Source: Dumfries

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.