Fell Wind Farm Site Between Blackcraig Wind Farm And Loch Urr 7km To The South-west Of Moniaive

25/0141/S42Section 42Awaiting decision
Discharge / amendments

Proposal

ERECTION OF WIND FARM OF UP TO NINE WIND TURBINES (SEVEN TURBINES MAXIMUM HEIGHT 200 METRE TO BLADE TIP AND TWO TURBINES MAXIMUM HEIGHT 180 METRES TO BLADE TIP) , FORMATION OF ACCESS AND ACCESS TRACKS, BORROW PIT, TEMPORARY CONSTRUCTION COMPOUND, ERECTION OF SUBSTATION AND BATTERY STORAGE FACILITY AND ASSOCIATED INFRASTRUCTURE (TO ALLOW THE TIP HEIGHT OF TURBINE 2 TO BE INCREASED FROM 180 METRES TO 200 METRES HIGH (AT VARIANCE WITH CONDITION 1 OF PLANNING PERMISSION 22/0471/S42 (APPEAL REFERENCE PPA-170-2163) TO ALLOW A FURTHER 5 YEARS TO INITIATE THE DEVELOPMENT (SECTION 42)

Received
23 January 2025
Ward
Dee And Glenkens
  1. Received23 Jan
  2. Validated23 Jan
  3. Consult.19 Feb
  4. Target
  5. Decided

Have your say

Comments close on 19 February.

About this application

This is a planning application at Fell Wind Farm Site Between Blackcraig Wind Farm And Loch Urr 7km To The South-west Of Moniaive. Dumfries has handled 3,813 applications of this type. It has been with the council since 23 January 2025 and is still awaiting a decision. There has been 1 other application at this address. In the past year there have been 127 applications across Dee And Glenkens.

Application details

Application type
Section 42
Scale / size
Small

Planning application dates

Date validated
23 January 2025
Consultation expiry
21 February 2025
Neighbour consultation end
19 February 2025
Last date for comments
21 February 2025

Publicity

Advertisement expiry
21 February 2025

Additional information

Comments
0
Documents
33

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Source: Dumfries

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report