Skip to content

Three Gates Stable Block, Three Gates, Leigh, DT9 6JQ

1/E/04/001133Full Planning ApplicationRefused
Full

Refused on 7 September 2004

Planning committee

Approximate location: the centre of the postcode, not the exact property.

Proposal

Site 4No mobile homes and 4No touring caravans for occupation by gypsies (caravans to be used ancillary to the respective mobile homes - once mobile homes stationed on site) Use stable block as utility block.

Submitted
6 July 2004
Decision level
Planning committee
Ward
Cam Vale Ward
  1. Received6 Jul
  2. Validated6 Jul
  3. Consult.6 Aug
  4. Target
  5. Decided7 Sep

Decided in 63 days (council typically 42)

About this application

This is a full planning application at THREE GATES STABLE BLOCK, THREE GATES, LEIGH, DT9 6JQ. Dorset has handled 11,876 applications of this type. This one was decided in 63 days, 3 weeks longer than Dorset's typical decision time. There are no previous applications recorded at this address. We hold 3,007 applications in total for the DT9 postcode area.

92% of full applications at Dorset Council were approved. Across all application types, the council typically decides in about 6 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Postcode
DT9 6JQ
Application type
Full Planning Application
Scale / size
Small
Parish
Leigh
District
West Dorset

Planning application dates

Date validated
6 July 2004
Consultation expiry
6 August 2004
Consultation end
6 August 2004
Committee meeting
26 August 2004

Appeal

Appeal type
Local Inquiry
Appeal date
17 November 2004
Appeal result
Withdrawn
Appeal decision date
27 April 2005

Additional information

Documents
7

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Nutrient neutrality catchment: Parrett CatchmentApplies to new homes and overnight accommodation
  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.

Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Dorset

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near DT9

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.