Pineapple Farm, Pineapple Lane, Salwayash, Bridport, DT6 5HZ
Approved on 4 December 2013
Council decision: GrantedDelegated (officer decision)
Proposal
Installation of a 50 Kv ground mounted photovoltaic array
- Submitted
- 9 October 2013
- Decision level
- Delegated (officer decision)
- Council
- Dorset Council
- Ward
- Netherbury Ward
- ReceivedSubmitted9 Oct
- ValidatedValidated9 Oct
- Consult.Consultation20 Nov
- TargetTarget Date
- DecidedDecided4 Dec
Decided in 56 days (council typically 42)
About this application
This is a full planning application for a solar installation at PINEAPPLE FARM, PINEAPPLE LANE, SALWAYASH, BRIDPORT, DT6 5HZ. Dorset has handled 11,876 applications of this type. This one was decided in 56 days, 2 weeks longer than Dorset's typical decision time. There have been 7 other applications at this address. We hold 1,726 applications in total for the DT6 postcode area.
92% of full applications at Dorset Council were approved. Across all application types, the council typically decides in about 6 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- DT6 5HZ
- Application type
- Full Planning Application
- Scale / size
- Small
- Parish
- Netherbury
- District
- West Dorset
Planning application dates
- Date validated
- 9 October 2013
- Consultation expiry
- 20 November 2013
- Consultation end
- 20 November 2013
Additional information
- Documents
- 9
Site constraints
Designations at the address point. Ones next to the site may also apply.
- National Landscape (AONB): Dorset
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 201412 Feb
Amendment to planning permission reference 1/D/13/001339
ApprovedNon-material amendmentAmendmentWD/D/14/000390 - 20139 Oct
Installation of a 50 Kv ground mounted photovoltaic array
This applicationApprovedFull1/D/13/001339
Planning history at this site
6 other applications at this property, newest first.
- 201817 Jul
Installation of hardened storage area needed for agricultural equipment and supplies
ApprovedOutlineWD/D/18/001587 - 201820 Apr
Application for an exempted camp site at Pineapple Farm. Extension of existing camp site for an additional 10…
ApprovedHistoric ApplicationsWD/D/18/000808 - 20151 Jul
Erect Agricultural Building
ApprovedOutlineWD/D/15/001622 - 20138 May
Rebuild the disused Stable at Pineapple Farm and re-use it as a holiday let.
ApprovedFull Planning Application1/D/13/000594 - 201015 Dec
Wind turbine & ancillary supporting control box
WithdrawnFull Planning Application1/D/10/002049 - 200631 May
Construct wildlife pond
ApprovedFull Planning Application1/W/06/000358
Source: Dorset
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near DT6
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Pineapple Farmhouse, Salway Ash, NETHERBURY1/W/00/000313 · FullApproved0.0 mi
- UNIT 5-9, PINEAPPLE FARM, PINEAPPLE LANE, SALWAYASH, BRIDPORT, DT6 5HZWD/D/20/001268Approved0.0 mi
- SILAGE PIT 2 & 3, PINEAPPLE FARM, PINEAPPLE LANE, SALWAYASH, BRIDPORT, DT6 5HZWD/D/14/001965 · OutlineApproved0.0 mi
- Pineapple Farm, Salway Ash, NETHERBURY1/W/00/000595_2 · AmendmentApproved0.0 mi
- PINEAPPLE FARM, PINEAPPLE LANE, SALWAYASH, BRIDPORT, DT6 5HZWD/D/18/000808Approved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for electrical near this site- Fawkes Electrical LtdElectricianSolar Panel Installer0.3 mi
- Peter George Electrical LtdElectrician1.1 mi
- CHG South West LtdElectrician1.6 mi
- O'Brien Roofing LtdRooferRoofers1.7 mi
Planning something similar?
See what the council approved and refused for solar panel and heat pump installations on your street. Pick your home and get the evidence before you pay for drawings.