Skip to content

Tyler Hill Playing Field Summer Lane Tyler Hill Kent

CA/19/10218Works to a tree with a TPOApproved

Approved on 29 January 2020

Council decision: GRANTEDDelegated (officer decision)

Proposal

T.P.O. no 3, 1975 - T1) Oak, located to the right of the parking area - reduce to previous cutting points (20%) and to internal crown thin (15%), Oak, adjacent - cut back from power cables, Holly - cut back from power cables. On Oast boundary T2) Oak - remove dead stem, leaving 3-4m trunk, adjacent tree- remove dead stem, Oaks on the field side - remove dead branches. Rear boundary T3) - remove dead branches on the field side and fell Chestnut. Left boundary T4) - remove dead wood from several trees. Front boundary T5) - remove dead branches from trees adjacent to play area.

Received
4 December 2019
Decision level
Delegated (officer decision)
Ward
Blean Forest
  1. Received4 Dec
  2. Validated4 Dec
  3. Consult.24 Jan
  4. Target29 Jan
  5. Decided29 Jan

Decided in 56 days (council typically 56)

About this application

This is a tree application at Tyler Hill Playing Field Summer Lane Tyler Hill Kent. Canterbury has handled 246 applications of this type. This one was decided in 56 days. The site is in the Tyler Hill conservation area. There has been 1 other application at this address. In the past year there have been 79 applications across Blean Forest.

96% of trees applications at Canterbury City Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Works to a tree with a TPO
Scale / size
Small
Parish
Hackington

Planning application dates

Date validated
4 December 2019
Consultation expiry
3 January 2020
Last date for comments
24 January 2020
Target decision date
29 January 2020

Applicant and agent

Agent
D.Parr Tree Surgeons
Agent address
Firwood Cottage, Braggs Lane, Herne Common, Nr Herne Bay CT6 7NP

Planning decision

Statutory period
56 days

Publicity

Last advertised
3 January 2020

Additional information

Comments
0
Documents
5

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Conservation area: the Tyler Hill Conservation Area. Registered 27.03.1995
  • Listed building: the Tyler Hill Conservation Area. Registered 27.03.1995On or next to this site
  • Article 4 direction: Canterbury and surrounding area. Dated 25.02.2015 effective 25.02.2016
  • Nutrient neutrality catchment: Stodmarsh SAC/SPA/RamsarApplies to new homes and overnight accommodation
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (21)

flood storage areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Canterbury

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.