The O2 Masterplan Site Finchley Road London NW3 6LU
Proposal
Detailed planning permission for Development Plots N3-E, N4, and N5 and Outline planning permission for Development Plots N1, N2, N3, N6, N7, S1 and S8, including demolition of all existing structures and associated works, and redevelopment to include residential development (Class C3), commercial, business and service uses (Class E), local community uses (Class F2), and Sui Generis leisure uses (including cinema and drinking establishments) together with all landscaping, public realm, cycle parking and disabled car parking, highway works and infrastructure within and associated with those Development Plots, in accordance with the Development Specification. For the avoidance of doubt, the Detailed and Outline planning permission are separate and severable for each of the Plots shown on plan P011 and the description of development on any decision notice issued pursuant to the application would reflect that.
- Received
- 10 February 2022
- Decision due
- 9 March 2022
- Decision level
- Planning committee
- Council
- London Borough of Camden
- Ward
- West Hampstead (Pre May 2022)
- ReceivedReceived10 Feb
- ValidatedValidated16 Feb
- Consult.Consultation21 Mar
- TargetTarget Date9 Mar
- DecidedDecided
About this application
This is an outline application for demolition at The O2 Masterplan Site Finchley Road London NW3 6LU. Camden has handled 178 applications of this type. It has been with the council since 10 February 2022 and is still awaiting a decision. There are no previous applications recorded at this address. We hold 2,616 applications in total for the NW3 postcode area.
97% of outline applications at London Borough of Camden were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- NW3 6LU
- Application type
- Outline Planning Permission
- Development type
- C3 Dwelling House, Commercial, business & service uses, Local community uses
- Scale / size
- Large
Planning application dates
- Date validated
- 16 February 2022
- Consultation expiry
- 21 March 2023
- Consultation start
- 16 February 2022
- Consultation end
- 21 March 2023
- Last date for comments
- 21 March 2023
- Committee meeting
- 30 March 2023
Planning decision
- Statutory period
- 21 days
Publicity
- Site notice start
- 18 February 2022
Additional information
- Documents
- 143
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Article 4 direction: Basements
- Flood zone 1: Low probability (rivers and sea)
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202419 Feb
Details required by condition M19 (Air Quality Dust Monitoring) of planning permission ref. 2022/0528/P
PendingDischarge of conditions2024/0661/P - 202419 Feb
Details required by condition M26 (Land Contamination Risk Assessment) of planning permission ref. 2022/0528/P
PendingDischarge of conditions2024/0662/P - 202419 Feb
Details required by condition M21 (London Underground) of planning permission ref. 2022/0528/P
PendingDischarge of conditions2024/0663/P - 202419 Feb
Details required by condition M22 (Network Rail) of planning permission ref. 2022/0528/P
PendingDischarge of conditions2024/0664/P - 202210 Feb
Detailed planning permission for Development Plots N3-E, N4, and N5 and Outline planning permission for…
This applicationPendingOutline2022/0528/P
Source: Camden
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near NW3
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- O2 Masterplan Site Finchley Road London NW3 6LU2024/0663/P · ConditionsAwaiting decision0.0 mi
- O2 Masterplan Site Finchley Road London NW3 6LU2024/0662/P · ConditionsAwaiting decision0.0 mi
- O2 Masterplan Site Finchley Road London NW3 6LU2024/0661/P · ConditionsAwaiting decision0.0 mi
- O2 Masterplan Site Finchley Road London NW3 6LU2024/0664/P · ConditionsAwaiting decision0.0 mi
- The O2 Centre 255 Finchley Road London NW3 6LU2021/2770/P · OutlineAwaiting decision0.0 mi
For applicants and trades
Contractors near this project
Find contractors for new builds near this site- Atlas South Technical Service LimitedVerifiedLondonProperty MaintenanceHandyman2.4 mi
- Avent Roofing ServicesVerifiedWestminsterRoofing3.2 mi
- Orient Construction Consultancy LimitedVerifiedLondon4.7 mi
- Building Services LondonVerifiedLondonExtensionsLoft Conversions7.2 mi
Planning something similar?
See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.