Skip to content

Twyn Hywel Energy Park Land North-West Of Caerphilly

26/0622/NMAPending Decision
Discharge / amendments

Proposal

Seek approval of a non-material amendment to planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor) to amend the wording of Condition 42 (f)

Site boundary (council red line)
  1. Received
  2. Validated
  3. Consult.
  4. Target
  5. Decided

This is a planning application at Twyn Hywel Energy Park Land North-West Of Caerphilly. Caerphilly has handled 8,290 applications of this type and approves 86% of them, typically deciding them in 56 days. There have been 15 other applications at this address.

Application Details

Reference
26/0622/NMA
Address
Twyn Hywel Energy Park Land North-West Of Caerphilly
Local Authority
Caerphilly
Decision Status
Undecided

Applicant & Agent

Planning Application Dates

Planning Decision

Publicity

Appeal

Additional Information

Coordinates
51.622276, -3.278861
Enriching application data
2/3
Council recordsAppealsFlood risk

Source: Caerphilly

Track this application

Get email alerts when there is a planning decision or status change.

Planning history at this site

14 other applications at this property, newest first.

  1. 2026
    21 Aug

    Seek approval of a non material amendment to planning consent 25/0342/NCC

    PendingNon-material amendment26/0561/NMA
  2. 2026
    3 Aug

    Discharge condition 06 (CEMP) of planning consent 25/0342/NCC

    PendingDischarge of conditions26/0524/COND
  3. 2026
    4 Jun

    Discharge condition 26 (SI stability) of planning consent 25/0342/NCC

    PendingDischarge of conditions26/0395/COND
  4. 2026
    16 Apr

    Discharge condition 22 (Borrow pits) of planning consent 25/0342/NCC

    PendingDischarge of conditions26/0279/COND
  5. 2026
    13 Feb

    Discharge condition 25 (Hydrogeological) of planning consent 25/0342/NCC

    PendingDischarge of conditions26/0107/COND
  6. 2026
    26 Jan

    Discharge condition 28 (TV interference) of planning consent 25/0342/NCC

    PendingDischarge of conditions26/0062/COND

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report