142 Tubbenden Lane Orpington BR6 9PT
Approved on 19 December 2019
Council decision: Application PermittedDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Single storey infill extension to link detached garage to main house and alterations to roof height, front porch and access ramp with railings
- Received
- 15 October 2019
- Decision level
- Delegated (officer decision)
- Council
- London Borough of Bromley
- Ward
- Farnborough And Crofton
- ReceivedReceived15 Oct
- ValidatedValidated15 Oct
- Consult.Consultation19 Nov
- TargetTarget Date10 Dec
- DecidedDecided19 Dec
Decided in 65 days (council typically 56)
About this application
This is a full planning application for a porch at 142 Tubbenden Lane Orpington BR6 9PT. Bromley has handled 8,588 applications of this type. This one was decided in 65 days, 9 days longer than Bromley's typical decision time. There have been 2 other applications at this address. We hold 4,117 applications in total for the BR6 postcode area.
77% of full applications at London Borough of Bromley were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- BR6 9PT
- Application type
- Full App (Householder Development)
- Scale / size
- Small
Planning application dates
- Date validated
- 15 October 2019
- Consultation expiry
- 19 November 2019
- Consultation start
- 29 October 2019
- Consultation end
- 19 November 2019
- Neighbour consultation start
- 29 October 2019
- Neighbour consultation end
- 19 November 2019
- Last date for comments
- 19 November 2019
- Target decision date
- 10 December 2019
- Permission expires
- 19 December 2022
Planning decision
- Statutory period
- 56 days
Additional information
- Planning Portal ID
- PP-08224963
- Documents
- 8
- Constraints
- 3
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 20201 May
Amendment to planning application 19/04409/FULL6
ApprovedNon-material amendmentAmendment19/04409/AMD - 201915 Oct
Single storey infill extension to link detached garage to main house and alterations to roof height, front…
This applicationApprovedFull19/04409/FULL6
Planning history at this site
2 other applications at this property, newest first.
Source: Bromley
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near BR6
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 142 Tubbenden Lane Orpington BR6 9PT19/02720/FULL6 · FullApproved0.0 mi
- 142 Tubbenden Lane, Orpington, BR6 9PT20/02166/FULL6 · FullApproved0.0 mi
- 142 Tubbenden Lane Orpington BR6 9PT19/04409/AMD · AmendmentApproved0.0 mi
- Land Outside 2A Tile Farm Road Orpington18/04644/FULL5 · TelecomsRefused0.0 mi
- 150 Tubbenden Lane Orpington BR6 9PT20/00396/FULL6 · FullApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Design and Management Systems LtdVerifiedElectrician5.0 mi
- S & M Solutions Ltd | Design and Build ContractorVerifiedLondonExtensionsLoft Conversions8.1 mi
- Bello Electrics LTDVerifiedElectrician9.8 mi
- Red Oak Construction LtdNortholt0.1 mi
Planning something similar?
See what the council approved and refused for single-storey side extensions on your street. Pick your home and get the evidence before you pay for drawings.