23 Moorfield Road Orpington BR6 0HG
Refused on 26 April 2018
Council decision: Application RefusedDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Single storey side, rear extension and internal alterations
- Received
- 23 February 2018
- Decision level
- Delegated (officer decision)
- Council
- London Borough of Bromley
- Ward
- Petts Wood And Knoll
- Agent
- Anderson North Ltd
- ReceivedReceived23 Feb
- ValidatedValidated23 Feb
- Consult.Consultation27 Mar
- TargetTarget Date20 Apr
- DecidedDecided26 Apr
Decided in 62 days (council typically 56)
About this application
This is a full planning application for a rear extension at 23 Moorfield Road Orpington BR6 0HG. Bromley has handled 8,588 applications of this type. This one was decided in 62 days, 6 days longer than Bromley's typical decision time. There have been 3 other applications at this address. We hold 4,117 applications in total for the BR6 postcode area.
77% of full applications at London Borough of Bromley were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- BR6 0HG
- Application type
- Full App (Householder Development)
- Scale / size
- Small
Planning application dates
- Date validated
- 23 February 2018
- Consultation expiry
- 27 March 2018
- Consultation start
- 6 March 2018
- Consultation end
- 27 March 2018
- Neighbour consultation start
- 6 March 2018
- Neighbour consultation end
- 27 March 2018
- Last date for comments
- 2 April 2018
- Target decision date
- 20 April 2018
Applicant and agent
- Agent
- Anderson North Ltd
- Architect profile
- ANDERSON NORTH LIMITED
- Agent address
- 43 Lambourne Drive Kings Hill Kent ME19 4FN
Planning decision
- Statutory period
- 56 days
Appeal
- Appeal status
- Appeal decided
- Appeal result
- Appeal Withdrawn
Additional information
- Documents
- 16
- Constraints
- 4
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 201826 Feb
Loft Conversion comprising rear dormerPROPOSED LAWFUL DEVELOPMENT CERTIFICATE
ApprovedCertificate of Lawfulness proposedFiled alongside18/00895/PLUD - 201823 Feb
Single storey side, rear extension and internal alterations
This applicationRefusedFull18/00897/FULL6
Planning history at this site
2 other applications at this property, newest first.
Source: Bromley
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near BR6
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 23 Moorfield Road Orpington BR6 0HG18/00895/PLUD · OutlineApproved0.0 mi
- 23 Moorfield Road Orpington BR6 0HG18/02234/FULL6 · FullApproved0.0 mi
- 23 Moorfield Road Orpington BR6 0HG18/05050/FULL6 · FullApproved0.0 mi
- 51 MOORFIELD ROAD, ORPINGTON, BR6 0HG25/05244/HPA · FullApproved0.0 mi
- 25 Moorfield Road Orpington BR6 0HG24/04246/FULL6 · FullApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Design and Management Systems LtdVerifiedElectrician4.2 mi
- S & M Solutions Ltd | Design and Build ContractorVerifiedLondonExtensionsLoft Conversions7.5 mi
- DampWorks LtdDamp Proofing & Timber Treatment SpecialistsWaterproofing Specialists0.1 mi
- 1st Scenic LtdWindow & Door Installer0.1 mi
Planning something similar?
See what the council approved and refused for wrap-around (side and rear) extensions on your street. Pick your home and get the evidence before you pay for drawings.