Unit 1-2 Concorde Business Centre Main Road Airport Industrial Estate Biggin Hill Westerham Kent TN16 3YN
Approved on 11 October 2007
Council decision: Application PermittedDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Extension on roof to provide enclosed viewing platform (Unit 1)
- Received
- 20 August 2007
- Decision level
- Delegated (officer decision)
- Council
- London Borough of Bromley
- Ward
- Biggin Hill
- ReceivedReceived20 Aug
- ValidatedValidated20 Aug
- Consult.Consultation25 Sep
- TargetTarget Date15 Oct
- DecidedDecided11 Oct
Decided in 52 days (council typically 56)
About this application
This is a full planning application for an extension at Unit 1-2 Concorde Business Centre Main Road Airport Industrial Estate Biggin Hill Westerham Kent TN16 3YN. Bromley has handled 8,588 applications of this type. This one was decided in 52 days, 4 days quicker than Bromley's typical decision time. There have been 2 other applications at this address. In the past year there have been 39 applications across Biggin Hill. We hold 2,970 applications in total for the TN16 postcode area.
77% of full applications at London Borough of Bromley were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Postcode
- TN16 3YN
- Application type
- Full App (Any Operational Development)
- Scale / size
- Small
Planning application dates
- Date validated
- 20 August 2007
- Consultation expiry
- 26 September 2007
- Consultation start
- 4 September 2007
- Consultation end
- 25 September 2007
- Neighbour consultation start
- 29 August 2007
- Last date for comments
- 26 September 2007
- Target decision date
- 15 October 2007
- Permission expires
- 11 October 2012
Applicant and agent
- Agent address
- 1 Turnberry Quay Glengall Bridge London E14 9RD
Planning decision
- Statutory period
- 56 days
Publicity
- Last advertised
- 5 September 2007
- Advertisement expiry
- 26 September 2007
Additional information
- Documents
- 11
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
2 other applications at this property, newest first.
- 20085 Feb
Extension on roof to provide enclosed viewing platform (Unit 1)(Amendment to permission ref.07/03046
ApprovedFull App (Any Operational Development)08/00421/FULL1 - 200631 Oct
Extension of existing mezzanine floor to unit 1 and alterations to fenestration and entrance to unit 1 and…
ApprovedFull App (Any Operational Development)06/03975/FULL1
Source: Bromley
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near TN16
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Unit 1-2 Concorde Business Centre Main Road Airport Industrial Estate Biggin Hill Westerham Kent TN16 3YN06/03975/FULL1 · FullApproved0.0 mi
- Unit 1-2 Concorde Business Centre Main Road Airport Industrial Estate Biggin Hill Westerham Kent TN16 3YN08/00421/FULL1 · FullApproved0.0 mi
- Concorde Business Centre Unit 7 Airport Industrial Estate Main Road Biggin Hill TN16 3YN12/02892/FULL1 · FullApproved0.0 mi
- Concorde Business Centre Unit 2 Airport Industrial Estate Main Road Biggin Hill TN16 3BW16/05713/FULL1 · FullApproved0.0 mi
- CONCORDE BUSINESS CENTRE, AIRPORT INDUSTRIAL ESTATE, MAIN ROAD, BIGGIN HILL, WESTERHAM, TN16 3YN26/01378/ADV · AdvertisingApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Design and Management Systems LtdVerifiedElectrician8.4 mi
- Emergency Electrician 24 Hour Grip Electric LtdVerifiedMerstham, RedhillElectricalEmergency electrical fault finding8.4 mi
- Lambert Heating & Renewables LtdVerified8.9 mi
- Bello Electrics LTDVerifiedElectrician9.3 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report