The Mall Cribbs Causeway Patchway South Gloucestershire BS34 5DG
Proposal
Alterations and extension of The Mall including the erection of new buildings for uses within Use Classes A1 (shops) up to 35,250 sqm, A2-A5 (financial and professional services, restaurants and cafes, drinking establishments and hot food takeaway) up to 8,980 sqm, D1 (non-residential institutions) up to 620 sqm, D2 (assembly and leisure) up to 7,620 sqm, C1 (hotel) up to 4,700 sqm, C3 (dwellings comprising apartments) up to 150 units, provision of a new multi-storey car park and alterations to existing entrances. Erection of new bus station uses (sui generis) up to 1,650 sq m. Provision of new public realm, including public space and landscaped areas. Provision of new roads and pedestrian routes and cycle ways, including a new pedestrian and cycle bridge over Merlin Road, and other ancillary works and operations. Temporary works including provision of temporary bus station comprising works to existing surface car parking areas and temporary contractor and car parking compounds and associated facilities. (Outline application with all matters reserved.)
- Received
- 20 September 2016
- Decision due
- 11 October 2016
- Council
- Bristol City Council
- Ward
- Hotwells & Harbourside
- ReceivedReceived20 Sep
- ValidatedValidated20 Sep
- Consult.Consultation
- TargetTarget Date11 Oct
- DecidedDecided
Have your say
About this application
This is a planning application for an extension at The Mall Cribbs Causeway Patchway South Gloucestershire BS34 5DG. Bristol has handled 13,720 applications of this type. It has been with the council since 20 September 2016 and is still awaiting a decision. There have been 4 other applications at this address. In the past year there have been 79 applications across Hotwells & Harbourside. We hold 758 applications in total for the BS34 postcode area.
Application details
- Postcode
- BS34 5DG
- Application type
- Other Consultations
- Scale / size
- Large
- Number of dwellings
- 150
- Parish
- Central, Clifton And Harbourside
- District
- Central, Clifton And Harbourside
Planning application dates
- Date validated
- 20 September 2016
Planning decision
- Statutory period
- 21 days
Additional information
- Documents
- 1
- Constraints
- 3
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (24)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
2 other applications at this property, newest first.
- 201729 Nov
Request for comment on an application in an adjoining authority: - Alterations and extension of The Mall…
ApprovedOther ConsultationsPT14/4894/O - 20155 Jan
Alterations and extension of The Mall, including the erection of new buildings for uses within Use Classes A1…
RefusedOther Consultations15/00036/K
Source: Bristol
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near BS34
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- San Andreas Roundabout Cribbs Causeway South Gloucestershire BS34 5DG18/01241/KApproved0.0 mi
- The Mall Upper Level Cribbs Causeway Regional Shopping Centre Patchway South Gloucestershire BS34 5DGPT15/3859/F · FullApproved0.0 mi
- The Mall Upper Level Cribbs Causeway Regional Shopping Centre Patchway South Gloucestershire BS34 5DGPT15/3897/F · FullApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Davis Electrical and Property ServicesVerifiedElectrician8.1 mi
- M T Electrical ServicesElectrician0.6 mi
- Ernest Till Southwest & Co LtdElectrician0.8 mi
- M&E Works LtdElectrician0.8 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.