Skip to content

Careys, Land opposite Careys, Mcardle House, Workshop Office & Car Park, Great Central Way, Wembley, HA9

26/2486Approved
Discharge / amendments

Approved on 29 October 2026

Council decision: Permission Granted33 conditions

Proposal

Non-material amendment to conditions 2 (approved drawings/documents), 14 (CIL phasing); description of development and insertion of conditions: Condition 14 (CIL Phasing); Condition 15 (The Hub ? Affordable Workspace Landscaping); Condition 16 (The Hub ? Public Realm Grading); Condition 38 (Method Statement and Risk Assessment); Condition 39 (Scaffolding Works ? Network Rail); Condition 40 (Demolition Methodology Statement); Condition 41 (Drainage ? Network Rail); Condition 42 (Groundworks ? Network Rail); Condition 43 (Risk Assessment and Method Statement ? Network Rail); Condition 44 (Vehicle Safety Protection ? Network Rail); and Condition 45 (Trespassing ? Network Rail) of Full Planning Permission reference 24/3106 dated 20 July, 2026, for Demolition of all buildings and structures; phased redevelopment of the two land parcels either side of Great Central Way to provide an industrial complex comprising five new buildings, split across five industrial units, for flexible Class E(g)(iii)/B2/B8 use, with ancillary office space, an affordable workspace building with flexible ground floor cafe use (Use Class E), parking and servicing areas, means of enclosure, cycle parking, landscaping and access for vehicles and pedestrians. Subject to a Legal Agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended) dated the 26 June 2026.

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Received
1 October 2026
Public comments
0 · last counted 30 October 2026
Ward
Wembley Park
  1. Received1 Oct
  2. Validated1 Oct
  3. Consult.
  4. Target29 Oct
  5. Decided29 Oct

Decided in 28 days

About this application

This is a planning application for demolition at Careys, Land opposite Careys, Mcardle House, Workshop Office & Car Park, Great Central Way, Wembley, HA9. Brent has handled 19,392 applications of this type. This one was decided in 28 days, 4 weeks quicker than Brent's typical decision time. The site is in a conservation area. There have been 2 other applications at this address. In the past year there have been 65 applications across Wembley Park.

Application details

Planning application dates

Date validated
1 October 2026
Target decision date
29 October 2026

Applicant and agent

Applicant
Private applicant

Planning decision

Case officer
Gary Murphy

Additional information

Documents
55

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Article 4 direction: Article 4 for SIL and LSIS - Strategic Employment Area
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2026
    1 Oct

    Non-material amendment to conditions 2 (approved drawings/documents), 14 (CIL phasing); description of…

    This applicationApprovedNon-material amendment26/2486
  2. 2024
    5 Nov

    Demolition of all buildings and structures; phased redevelopment of the two land parcels either s...

    ApprovedApplicationPart of24/3106

Source: Brent

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

For the applicant

Need an ecological survey or mitigation plan? Ecologists near this site

Conditions 15, 17, 32 and BNG on the decision ask for this.

Nearest first, within 25 miles of the site. Every firm is listed free.

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.