Skip to content

(Plot NE01) Land to the East of Rutherford Way, North of Engineers Way and South of Fulton Road

23/1656Conditions pursuant to a full permissionPermitted
Full

Proposal

Details pursuant to condition 3 (ground floor facades to Rutherford Way and Allegro Lane) relating to Reserved matters permission 22/3208 dated 15 December 2022 in relation to hybrid planning permissions 22/2886 dated 06/12/2022 and 20/2844 dated 30/03/2021 for the access, appearance, landscaping, layout and scale for Plot NE01 comprising the construction of a single building arranged on ground and 19 upper storeys providing 770 student accommodation units (Use Class Sui Generis) with ground floor ancillary communal floorspace and a private communal landscaped garden for student use as well as associated plant, cycle storage, refuse provision, other ancillary space and associated infrastructure and public realm including new pedestrianised estates roads, and works to Rutherford Way and Fulton Road including the provision of parking and loading bays, and the installation of hard and soft landscaping, lighting and other associated works. Information is provided to discharge the following conditions for Plot NE01; 1: Layout, Scale, Appearance, Access, and Landscaping; 17: Student Accommodation Demand Assessment 19(d): Cycle Storage; 19(e): Car Parking; 19(h): Wind; 19(k): Internal layout of buildings; 19 (l): Access; 20(d): Contours and ground levels; 20(f): Provision of green/brown roofs; 25: Cycle routes; 30: Wheelchair Accessible Accommodation; 36: Vibration levels; 38: Air Quality; 49: Phasing Plan.

Received
12 May 2023
Decided
24 August 2023 · Permission Granted
Decision level
Delegated (officer decision)
Ward
Wembley Park
Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

  1. Received12 May
  2. Validated12 May
  3. Consult.24 Aug
  4. Target
  5. Decided24 Aug

Decided in 104 days (council typically 56)

8 weeks typical decision time in Brent93% of conditions applications approved

This is an application to discharge conditions at (Plot NE01) Land to the East of Rutherford Way, North of Engineers Way and South of Fulton Road. Brent has handled 629 applications of this type and approves 91% of them, typically deciding them in 56 days. This one was decided in 104 days, 7 weeks longer than Brent's median. The site is in a conservation area. There have been 7 other applications at this address. In the past year there have been 62 applications across Wembley Park.

Application Details

Reference
23/1656
Address
(Plot NE01) Land to the East of Rutherford Way, North of Engineers Way and South of Fulton Road
Local Authority
Brent
Application Type
Conditions pursuant to a full permission
Scale / Size
Small
Decision Status
Permitted
Current Status
Decided
Ward
Wembley Park

Applicant & Agent

Agent
CarneySweeney
Agent Address
Office 3.18, Scott House, Suite 1, The Concourse, Waterloo Station, London, SE1 7LY

Planning Application Dates

Date Received
12 May 2023
Date Decided
24 August 2023
Date Validated
12 May 2023
Date Submitted
12 May 2023
Last Date for Comments
24 August 2023

Planning Decision

Decision
Permission Granted
Decided By
Delegated Team Manager

Publicity

Appeal

Additional Information

Planning Portal ID
PP-12144669
Comments
0
Documents
6
Constraints
3
Coordinates
51.560028, -0.277924
Enriching application data
2/3
Council recordsAppealsFlood risk

Source: Brent

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Planning constraints

Designations that overlap or adjoin the site outline.

  • Flood zone 2: Medium probability (rivers and sea)Part of the site
  • Article 4 direction: Article 4 for Site Allocations - Watkin RoadPart of the site
  • Brownfield land register: Wembley Retail ParkRegister site at or near this address · +3 more
Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-10-09. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report