Skip to content

Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

18/00407/AAdvertisementApproved
Advertisement consent

Approved on 6 August 2018

Council decision: Grant with Extra Conditions (Adverts)Delegated (officer decision)

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Display of advertising signs (v-boards, bridge signs, gantry signs and box signs) and flags on Sopwith Road (north-south link road) and Forest Road, and gantry sign on Harvest Ride at entrance to Phase 5, for a temporary period.

Received
30 April 2018
Decision level
Delegated (officer decision)
Public comments
1
Ward
Binfield With Warfield
  1. Received30 Apr
  2. Validated30 Apr
  3. Consult.29 May
  4. Target25 Jun
  5. Decided6 Aug

Decided in 98 days (council typically 56)

About this application

This is an advertising consent application at Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire. Bracknell has handled 153 applications of this type. This one was decided in 98 days, 6 weeks longer than Bracknell's typical decision time. There have been 9 other applications at this address.

81% of advertising applications at Bracknell Forest Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.See what's approved near your address

Application details

Application type
Advertisement
Scale / size
Small
Parish
Warfield Parish Council

Planning application dates

Date validated
30 April 2018
Consultation expiry
29 May 2018
Consultation end
29 May 2018
Neighbour consultation start
8 May 2018
Neighbour consultation end
29 May 2018
Last date for comments
29 May 2018
Target decision date
25 June 2018
Permission expires
30 April 2023

Planning decision

Statutory period
56 days

Additional information

Planning Portal ID
PP-06870739
Documents
21

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)Part of the site
  • Ancient woodland: (tithe: Furzes Coppice)Next to the site

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (21)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Planning history at this site

9 other applications at this property, newest first.

  1. 2018
    16 Apr

    Submission of details of layout, scale, appearance and landscaping relating to Phases 6 and 7 of the land…

    ApprovedReserved matters18/00396/REM
  2. 2018
    15 Jan

    Submission of details of layout, scale, appearance, access and landscaping for laying out of site for…

    ApprovedReserved matters17/01383/REM
  3. 2017
    5 Jun

    Formation of access from West End Lane to serve a foul water pumping station and an above ground pressure…

    ApprovedFull17/00565/FUL
  4. 2016
    22 Nov

    Submission of details of access, appearance, landscaping, layout and scale for Phase 4B of the development at…

    ApprovedReserved matters16/01123/REM
  5. 2015
    11 Sep

    Submission of details of scale, layout, appearance, access and landscaping for part of the East-West Greenway…

    ApprovedReserved matters15/00908/REM
  6. 2015
    30 Jun

    Erection of approx. 200m length of externally illuminated advertisement hoarding and display of externally…

    ApprovedAdvertisement consent15/00605/A

Source: Bracknell

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report