Land to the rear of 740, 744 and Land to the South West of 744 Preston Old Road Blackburn
Approved on 12 October 2026
Council decision: PERMITS
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Retention of an ancillary office cabin, veranda decking extension to White House, static caravan (Use Class C2) , timber cabin (Use Class C2) with deck and fencing and retaining wall, bamboo lounge, container and southern cabin for storage (Retrospective)
- Received
- 24 December 2025
- Ward
- Livesey with Pleasington
- ReceivedReceived24 Dec
- ValidatedValidated21 Jan
- Consult.Consultation26 Mar
- TargetTarget Date25 Feb
- DecidedDecided12 Oct
Decided in 264 days (council typically 49)
About this application
This is an application to amend a permission at Land to the rear of 740, 744 and Land to the South West of 744 Preston Old Road Blackburn. Blackburn with Darwen has handled 172 applications of this type. This one was decided in 292 days, 35 weeks longer than Blackburn with Darwen's typical decision time. There are no previous applications recorded at this address. In the past year there have been 9 applications across Livesey with Pleasington.
92% of amendment applications at Blackburn with Darwen Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Planning Application (Retrospective)
- Scale / size
- Small
- Parish
- Blackburn
Planning application dates
- Date validated
- 21 January 2026
- Consultation expiry
- 26 March 2026
- Consultation start
- 22 January 2026
- Consultation end
- 26 March 2026
- Last date for comments
- 26 March 2026
- Target decision date
- 25 February 2026
- Application expires
- 11 March 2026
Planning decision
- Statutory period
- 49 days
Publicity
- First advertised
- 16 February 2026
Additional information
- Documents
- 22
Site constraints
Designations that overlap or adjoin the site outline.
- Green belt: Blackburn with Darwen
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Blackburn with Darwen
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Feniscowles And Pleasington War Memorial Recreation Ground Livesey Branch Road Livesey Blackburn BB2 5EG10/26/0323 · FullAwaiting decision0.2 mi
- Opposite Clarens, Greenway, Greenview/Heathfield, Tuberie, Links Lane Pleasington10/23/0698 · TreesApproved0.2 mi
- 2 Tintagel Close Feniscowles Blackburn BB2 5JN10/23/1052 · TreesApproved0.3 mi
- Land at the former Sappi Paper Mill (former Sappi Site) Livesey Branch Road Blackburn BB2 5FD10/24/0806 · ConditionsApproved0.3 mi
- Brownlow Lodge Pleasington Lane Pleasington Blackburn BB2 5JE10/26/0196 · TreesApproved0.3 mi
For applicants and trades
Contractors near this project
- A&G Chimney SweepsSolid Fuel Heating0.5 mi
- B.H. ElectricalElectrician0.9 mi
- JJH Building Contractors LtdWindow & Door Installer1.8 mi
- Graeme Lee GlazingWindow & Door Installer1.9 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.