Redesdale House Ashcombe Place Edgworth Bolton BL7 0QN
Approved on 3 July 2023
Council decision: PermitsDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Demolition of existing canopy and erection of single storey rear extension
- Received
- 23 May 2023
- Decision level
- Delegated (officer decision)
- Ward
- West Pennine
- ReceivedReceived23 May
- ValidatedValidated25 May
- Consult.Consultation3 Jul
- TargetTarget Date5 Jul
- DecidedDecided3 Jul
Decided in 39 days (council typically 49)
About this application
This is a full planning application for demolition at Redesdale House Ashcombe Place Edgworth Bolton BL7 0QN. Blackburn with Darwen has handled 1,326 applications of this type. This one was decided in 41 days, 8 days quicker than Blackburn with Darwen's typical decision time. The site is in 1 listed building nearby. There have been 2 other applications at this address. In the past year there have been 78 applications across West Pennine. We hold 1,957 applications in total for the BL7 postcode area.
96% of full applications at Blackburn with Darwen Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- BL7 0QN
- Application type
- Full Planning Application
- Scale / size
- Small
- Parish
- North Turton
Planning application dates
- Date validated
- 25 May 2023
- Consultation expiry
- 3 July 2023
- Consultation start
- 26 May 2023
- Consultation end
- 3 July 2023
- Last date for comments
- 17 June 2023
- Target decision date
- 5 July 2023
- Application expires
- 19 July 2023
- Permission expires
- 3 July 2026
Planning decision
- Statutory period
- 55 days
Additional information
- Documents
- 15
Site constraints
Designations that overlap or adjoin the site outline.
- Green belt: Blackburn with DarwenNext to the site
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202323 May
Demolition of existing canopy and erection of single storey rear extension
This applicationApprovedFull10/23/0438 - 202317 May
Single storey rear extension
WithdrawnCertificate of Lawfulness (Proposed)Filed alongside10/23/0417
Planning history at this site
1 other application at this property, newest first.
Source: Blackburn with Darwen
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near BL7
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Redesdale House Ashcombe Place Edgworth Bolton BL7 0QN10/23/0417 · OutlineWithdrawn0.0 mi
- Former Crowthorn School Edgworth BL7 0JS10/09/0893 · FullApproved0.0 mi
- Land adjacent to the Coach House Broadhead Road Edgworth10/04/1070 · FullApproved0.0 mi
- Land adjacent to The Coachhouse Broadhead Road Edgworth10/03/0662 · OutlineApproved0.0 mi
- Redesdale House Ashcombe Place Edgworth Bolton BL7 0QN10/23/0689 · ConditionsApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Arbortec NW LtdTree Surgeons0.8 mi
- Case Electrical Services LtdElectricianAlternative Power Supplies1.6 mi
- Apex ElectricalElectrician2.2 mi
- Groundwork Landscapes LtdLandscapers2.2 mi
Planning something similar?
See what the council approved and refused for single-storey rear extensions on your street. Pick your home and get the evidence before you pay for drawings.