Skip to content

Broomfield Road

24/01998/FULMINNon-Material AmendmentApproved
Discharge / amendments

Approved on 9 October 2025

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Non material amendment to alter floor plans and elevations of approved application 24/01998/FUL which allowed the 'Erection of part 1/part 2 storey front, side and rear extensions with accommodation at roof and basement level, following demolition of existing garage to provide 9 self-contained residential units with associated parking at rear'.

Submitted
11 September 2025
  1. Received11 Sep
  2. Validated
  3. Consult.
  4. Target
  5. Decided9 Oct

Decided in 28 days (council typically 56)

About this application

This is a planning application for demolition at Broomfield Road. Bexley has handled 47 applications of this type. This one was decided in 28 days, 4 weeks quicker than Bexley's typical decision time. There has been 1 other application at this address. In the past year there have been 16 applications across BEXHTH.

85% of non-material amendment applications at London Borough of Bexley were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Non-Material Amendment

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.

Possibly incomplete for this council: tree preservation orders.

Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Bexley

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.