22A Exton Road Bournemouth BH6 5QF
Refused on 23 June 2026
Delegated (officer decision)5 reasons for refusal
Proposal
Variation of condition 2 of planning permission 7-2022-22932-B (Erection of a garden room) to let out on a short term basis to paying guests
- Received
- 16 March 2026
- Decision level
- Delegated (officer decision)
- Ward
- Littledown & Iford
- ReceivedReceived16 Mar
- ValidatedValidated17 Mar
- Consult.Consultation19 Apr
- TargetTarget Date
- DecidedDecided23 Jun
Decided in 98 days (council typically 63)
About this application
This is an application to vary a condition at 22A Exton Road Bournemouth BH6 5QF. BCP has handled 279 applications of this type. This one was decided in 99 days, 5 weeks longer than BCP's typical decision time. There are no previous applications recorded at this address. In the past year there have been 63 applications across Littledown & Iford. We hold 436 applications in total for the BH6 postcode area.
87% of conditions applications at Bournemouth, Christchurch and Poole Council were approved. Across all application types, the council typically decides in about 9 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Why it was refused
- It is considered that the use of the outbuilding for holiday accommodation would result in an over-intensive use of the site, introducing a form of development that is uncharacteristic of Exton Road. The use as a short-term holiday let would be out of keeping with the established residential character, creating a new and incongruous pattern of development. This intensified use would lead to a congested form of development that fails to remain ancillary to the main dwelling, causing harm to the character and appearance of the area. As such, the proposal is contrary to Policies CS41 and CS28 of the Bournemouth Local Plan: Core Strategy (2012) and the National Planning Policy Framework (2024), all of which seek to ensure development is well-designed and respects local character.
- It is considered that the proposed use of the outbuilding as short-term holiday accommodation would result in an over-intensive and disruptive form of development, introducing transient occupancy and increased activity that would cause harm to the residential amenity of neighbouring properties. Additionally, the absence of information in regard to frequency of use and management arrangements raises concerns about uncontrolled intensification. As such, the proposal would be contrary to Policy CS41 of the Bournemouth Local Plan: Core Strategy (2012) and the National Planning Policy Framework (2024), which seek to protect residential amenity.
- The application has provided inadequate and insufficient information with regard to its demonstrable and acceptable meeting of the requisite onsite vehicular parking, cycle storage, and EV charging infrastructure provisions required for the proposed holiday accommodation letting use. The proposal and its highway implications therefore cannot be meaningfully assessed for the public record in line with the due and transparent planning process. The development represents poor design and is contrary to Policies CS16, CS17, CS18 and CS41 of the Bournemouth Local Plan Core Strategy (October 2012), the Parking Standards SPD (2021) and the NPPF (2024).
- It is considered the development would be harmful to the designated Dorset Heathlands SPA (Special Protection Area), Ramsar Site and Dorset Heaths SAC (Special Area of Conservation). The failure to make an appropriate contribution towards mitigation measures would have an adverse effect on the integrity of the sites and is therefore considered to be contrary to Policy CS33 of the Bournemouth Local Plan Core Strategy (2012) and the Dorset Heathlands Planning Framework 2020-2025 supplementary Planning Document (March 2020).
- The site lies within 13.8km of New Forest SAC, New Forest SPA and New Forest Ramsar, which are protected under European legislation for their wildlife importance, where it has been demonstrated in conjunction with New Forest Strategic Access Management and Monitoring Strategy 2023, prepared by Footprint Ecology and in agreement with Natural England that additional recreational pressure from the additional dwelling has the potential to harm their integrity. No mitigation or compensation measures have come forward to address such harms. It cannot be ruled out beyond all reasonable scientific doubt that the proposal would not have an adverse effect on the sensitive interest features of the habitat sites, either alone or in combination with other proposals. Taking a precautionary approach, it is considered that the proposal would be contrary to Section 63 of the Conservation of Habitats and Species Regulations 2017.
From the council's decision notice.
Application details
- Postcode
- BH6 5QF
- Application type
- Removal or Variation of Condition
- Scale / size
- Small
Planning application dates
- Date validated
- 17 March 2026
- Consultation expiry
- 19 April 2026
- Consultation end
- 19 April 2026
Applicant and agent
- Agent address
- 18 Albert Road 2 Lansdowne Crecent Bournemouth BH1 1BZ
Additional information
- Documents
- 9
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: BCP
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near BH6
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 125 Corhampton Road Bournemouth BH6 5NZP/25/02005/FUL · FullApproved0.1 mi
- 82 Southwick Road Bournemouth BH6 5PUP/26/01281/HOU · FullApproved0.1 mi
- 29 Ashford Road Bournemouth BH6 5QBP/25/04097/HOU · FullRefused0.1 mi
- 1247 Christchurch Road Bournemouth BH7 6BPP/25/04987/FUL · FullRefused0.1 mi
- 7 Harting Road Bournemouth BH6 5QJP/25/01134/HOU · FullApproved0.2 mi
For applicants and trades
Contractors near this project
Find contractors for new builds near this site- Total Construction (Hampshire) LimitedVerifiedRingwood8.4 mi
- Tech-Elec Services LtdElectrician0.2 mi
- O D ElectricalElectrician0.3 mi
- Electrical ServicesElectrician0.4 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report