99 Chatsworth Street Barrow-In-Furness Cumbria LA14 5TP
Approved on 16 September 2026
Proposal
Application for Approval of Details Reserved by Condition 4 (Construction Method Statement) and Condition 5 (surface water drainage scheme) of Planning Permission Reference B18/2025/0272
- Submitted
- 8 June 2026
- Council
- Barrow
- ReceivedSubmitted8 Jun
- ValidatedValidated8 Jun
- Consult.Consultation
- TargetTarget Date
- DecidedDecided16 Sep
Decided in 100 days
About this application
This is a planning application at 99 Chatsworth Street Barrow-In-Furness Cumbria LA14 5TP. Barrow has handled 1,051 applications of this type. This one was decided in 100 days, 6 weeks longer than Barrow's typical decision time. There are no previous applications recorded at this address. We hold 359 applications in total for the LA14 postcode area.
Application details
- Postcode
- LA14 5TP
Planning application dates
- Date validated
- 8 June 2026
Planning decision
- Case officer
- Barry Jesson
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Possibly incomplete for this council: conservation areas.
Also checked, none recorded (21)
flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Barrow
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near LA14
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 83 Hartington Street Barrow-In-Furness Cumbria LA14 5SSB20/2025/0176 · AmendmentAwaiting decision0.2 mi
- St James Church Hall, Hartington Street, Barrow-In-Furness, Cumbria, LA14 5SS.B20/2023/0694 · AmendmentApproved0.2 mi
- St James Church Hall, Hartington Street, Barrow-In-Furness, Cumbria, LA14 5SS.B20/2024/0491 · ConditionsApproved0.2 mi
- 85 Hartington Street Barrow-in-Furness Cumbria LA14 5SSB20/2023/0282Approved0.2 mi
- Barrow AFC, Holker Street Ground, Wilkie Road, Barrow-in-Furness, Cumbria LA14 5UW.BPAB/2026/0119Awaiting decision0.3 mi
For applicants and trades
Contractors near this project
- PPS Electrical LtdElectrician0.2 mi
- Andrew Deacon T/A Groundwork NE & CumbriaRetrofit Assessor0.2 mi
- S T S Electrical LtdElectrician0.3 mi
- Optech Electrical (a division of Optech)Electrician0.4 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report