53 Yarlside Road, Barrow-In-Furness, Cumbria, LA13 0EX
Approved on 19 August 2024
Council decision: APPCOND
Proposal
Conversion of garage to utility room/wc with front storage area and retention of rollover door. Widening of existing driveway and relaying with 'Marshalls Red Priora' permeable paving.
- Submitted
- 26 June 2024
- Council
- Barrow
- ReceivedSubmitted26 Jun
- ValidatedValidated26 Jun
- Consult.Consultation
- TargetTarget Date
- DecidedDecided19 Aug
Decided in 54 days
About this application
This is a planning application for a garage at 53 Yarlside Road, Barrow-In-Furness, Cumbria, LA13 0EX. Barrow has handled 1,051 applications of this type. This one was decided in 54 days. The site is in a conservation area. There are no previous applications recorded at this address. We hold 185 applications in total for the LA13 postcode area.
Application details
- Postcode
- LA13 0EX
Planning application dates
- Date validated
- 26 June 2024
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Possibly incomplete for this council: conservation areas.
Also checked, none recorded (21)
flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Barrow
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near LA13
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Land Behind 117 Yarlside Road Barrow-In-Furness Cumbria LA13 0HAB13/2025/0503Awaiting decision0.2 mi
- 4 Lakeland Avenue Barrow-In-Furness Cumbria LA13 0AYB21/2025/0516Awaiting decision0.2 mi
- 3 Azalea Walk Barrow-In-Furness Cumbria LA13 0RAB21/2025/0435Awaiting decision0.3 mi
- Land Opposite Numbers 78-92 Flass Lane, Barrow-in-Furness (LA13 0DE). OS Grid Reference SD 21672 70007.6/25/9001Approved0.3 mi
- 1 Acorn Bank Barrow-In-Furness Cumbria LA13 0RPB21/2026/0021Awaiting decision0.4 mi
For applicants and trades
Contractors near this project
Find contractors for renovations & refurbishments near this site- Leksure LtdElectrician0.1 mi
- DGR Operations LimitedElectrician0.8 mi
- B Martin Construction LtdWindow & Door Installer0.9 mi
- Shield Safe Electrical LimitedElectrician1.1 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report