Rowley Lodge Rowley Lane Barnet EN5 3HS
Approved on 19 September 2025
Council decision: Trees: Approve subject to conditionsDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Severe any tree root within 600mm of the boundary to a depth of 600mm on the Rowley Lodge (residential) side of the boundary fence with Rowley Lodge Rowley Lane, Barnet, EN5 3HS. The extent of works from the southeast corner of plot C to the eastern point of plot B, as shown on the submitted plan by a solid black line. Standing within T55 and T61 of order. Reason: To facilitate the installation of new rabbit proof fence (amended description)
- Received
- 13 June 2025
- Decision level
- Delegated (officer decision)
- Council
- London Borough of Barnet
- Ward
- High Barnet
- ReceivedReceived13 Jun
- ValidatedValidated13 Jun
- Consult.Consultation
- TargetTarget Date8 Aug
- DecidedDecided19 Sep
Decided in 98 days (council typically 56)
About this application
This is a tree application at Rowley Lodge Rowley Lane Barnet EN5 3HS. Barnet has handled 1,310 applications of this type. This one was decided in 98 days, 6 weeks longer than Barnet's typical decision time. There have been 4 other applications at this address. In the past year there have been 231 applications across High Barnet. We hold 3,740 applications in total for the EN5 postcode area.
90% of trees applications at London Borough of Barnet were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Postcode
- EN5 3HS
- Application type
- Works to TPO trees
- Scale / size
- Small
Planning application dates
- Date validated
- 13 June 2025
- Consultation expiry
- 7 August 2025
- Target decision date
- 8 August 2025
Planning decision
- Statutory period
- 56 days
Publicity
- Site notice start
- 17 July 2025
- Site notice end
- 7 August 2025
Site constraints
Designations that overlap or adjoin the site outline.
- Article 4 direction: Article 4 Small Houses in Multiple Occupation (HMO) Area 1
- Tree Preservation Order: 23/TPO/016Part of the site · +2 more
- Green belt: Barnet
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
5 other applications at this property, newest first.
- 202513 Jun
Remove any tree growing within 600mm of the boundary, severe any tree root within 600mm of the boundary to a…
ApprovedWorks to TPO treesTPP/0347/25 - 201725 Oct
Single storey front/side extension and new side porch. Internal alterations
ApprovedHouseholder17/6784/HSE - 201622 Jan
Change of use from Agricultural Building to Use Class C3 (residential) to provide (3 self contained…
RefusedPrior Notification (Agriculture to Res)16/0485/PNA - 201517 Jul
2 x Oak - Crown reduce lateral spread by 3 metres and reduce height to balance. T54 and T55 of Tree…
RefusedWorks to TPO treesTPP/00459/15 - 20152 Mar
Single storey front extension to create orangery
RefusedHouseholder15/01290/HSE
Source: Barnet
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near EN5
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Rowley Lodge Field Rowley Lane Barnet EN5 3HSTPP/0347/25 · TreesApproved0.0 mi
- Rowley Lodge Rowley Lane Barnet EN5 3HS16/0485/PNA · OutlineRefused0.0 mi
- Rowley Lodge Rowley Lane Barnet EN5 3HS15/01290/HSE · FullRefused0.0 mi
- Rowley Lodge Rowley Lane Barnet EN5 3HS17/6784/HSE · FullApproved0.0 mi
- Rowley Lodge Rowley Lane Barnet EN5 3HSTPP/00459/15 · TreesRefused0.0 mi
For applicants and trades
Contractors near this project
Find contractors for roofing near this site- Atlas South Technical Service LimitedVerifiedLondonProperty MaintenanceHandyman9.5 mi
- Orient Construction Consultancy LimitedVerifiedLondon10.0 mi
- Powercom ESI LtdElectrician0.2 mi
- Property Run Contracts LtdElectrician0.6 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report