Skip to content

Phase 3, Rivenwood Boulevard, Newtownards

LA06/2026/0647/DCDischarge of ConditionAwaiting decision
Discharge / amendments

Proposal

Discharge of Condition 7 of previously approved application LA06/2025/0566/F which states:- A final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed by the Council prior to any development activity including ground preparation or vegetation clearance. The final CEMP must identify the perceived risks to the aquatic environment, potential pollution pathways and mitigation measures to negate such risks. The final CEMP must, as a minimum, include the mitigation measures included within the outline CEMP as well as: a) Construction Method Statement(s) – including details of construction and excavation and timing of works; b) Pollution Prevention Plan – including details of a suitable buffer of 10m between the location of all construction works, refuelling, storage of excavated spoil/oil/fuel/substrate/construction materials/machinery, concrete mixing and washing areas and any watercourses or any surface drains present on or adjacent to the site. c) Site Drainage Plan; including details of Sustainable Drainage Systems (SuDS), foul waste disposal, surface water disposal/treatment and silt management measures; d) Spoil Management Plan; including location of spoil storage areas outwith the 10m buffer zone, management and handling of spoil and details of the reinstatement of excavated spoil; e) Environmental Emergency Plan; including details of emergency spill procedures and regular inspections of machinery onsite; f) Water Quality Monitoring Plan; g) Details of mitigation measures to protect badgers; h) Details of the appointment of an Ecological Clerk of Works and their roles and responsibilities. The final approved CEMP shall be fully implemented and adhered to during the construction phase to the reasonable satisfaction of the Council. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment and designated sites.

Received
16 July 2026
  1. Received16 Jul
  2. Validated16 Jul
  3. Consult.
  4. Target
  5. Decided

About this application

This is an application to discharge conditions at Phase 3, Rivenwood Boulevard, Newtownards. Ards and North Down has handled 182 applications of this type. It has been with the council since 16 July 2026 and is still awaiting a decision. There have been 3 other applications at this address.

96% of discharge of condition applications at Ards and North Down Borough Council were approved. Across all application types, the council typically decides in about 12 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Discharge of Condition

Planning application dates

Date validated
16 July 2026

Applicant and agent

Applicant
Private applicant
Agent
Emma McIlwaine
Agent address
20 May Street Belfast BT1 4NL

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Planning history at this site

1 other application at this property, newest first.

  1. 2026
    16 Jul

    Discharge of condition 2 of approvalLA06/2025/0566/F

    PendingDischarge of conditionsLA06/2026/0650/DC

Source: Ards and North Down

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.