Phase 3, Rivenwood Boulevard, Newtownards
Proposal
Discharge of Condition 7 of previously approved application LA06/2025/0566/F which states:- A final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed by the Council prior to any development activity including ground preparation or vegetation clearance. The final CEMP must identify the perceived risks to the aquatic environment, potential pollution pathways and mitigation measures to negate such risks. The final CEMP must, as a minimum, include the mitigation measures included within the outline CEMP as well as: a) Construction Method Statement(s) – including details of construction and excavation and timing of works; b) Pollution Prevention Plan – including details of a suitable buffer of 10m between the location of all construction works, refuelling, storage of excavated spoil/oil/fuel/substrate/construction materials/machinery, concrete mixing and washing areas and any watercourses or any surface drains present on or adjacent to the site. c) Site Drainage Plan; including details of Sustainable Drainage Systems (SuDS), foul waste disposal, surface water disposal/treatment and silt management measures; d) Spoil Management Plan; including location of spoil storage areas outwith the 10m buffer zone, management and handling of spoil and details of the reinstatement of excavated spoil; e) Environmental Emergency Plan; including details of emergency spill procedures and regular inspections of machinery onsite; f) Water Quality Monitoring Plan; g) Details of mitigation measures to protect badgers; h) Details of the appointment of an Ecological Clerk of Works and their roles and responsibilities. The final approved CEMP shall be fully implemented and adhered to during the construction phase to the reasonable satisfaction of the Council. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment and designated sites.
- Received
- 16 July 2026
- ReceivedReceived16 Jul
- ValidatedValidated16 Jul
- Consult.Consultation
- TargetTarget Date
- DecidedDecided
Have your say
About this application
This is an application to discharge conditions at Phase 3, Rivenwood Boulevard, Newtownards. Ards and North Down has handled 182 applications of this type. It has been with the council since 16 July 2026 and is still awaiting a decision. There have been 3 other applications at this address.
96% of discharge of condition applications at Ards and North Down Borough Council were approved. Across all application types, the council typically decides in about 12 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Discharge of Condition
Planning application dates
- Date validated
- 16 July 2026
Applicant and agent
- Applicant
- Private applicant
- Agent
- Emma McIlwaine
- Agent address
- 20 May Street Belfast BT1 4NL
Site constraints
Associated applications
- 202616 Jul
Discharge of Condition 7 of previously approved application LA06/2025/0566/F
This applicationPendingDischarge of conditionsLA06/2026/0647/DC - 202616 Jul
Discharge of condition 5 of LA06/2025/0566/F
PendingDischarge of conditionsLA06/2026/0648/DC - 202616 Jul
Discharge condition 4 of LA06/2025/0566/F
PendingDischarge of conditionsLA06/2026/0649/DC - 20252 Jul
Application for 6 dwellings - Change of House Type to Phase 3 Rivenwood Approval LA06/2021/0061/F
ApprovedFullPart ofLA06/2025/0566/F
Planning history at this site
1 other application at this property, newest first.
Source: Ards and North Down
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- 183A Donagahdee Road, Newtownards, BT23 7QPLA06/2025/0655/F · FullAwaiting decision0.5 mi
- 34 Ballyharry Park, Newtownards, BT23 8QXLA06/2023/1616/F · FullApproved0.6 mi
- 14 Abbey Mews, Newtownards.X/2008/1025/F · FullApproved0.9 mi
- 126 Donaghadee Road Newtownards BT23 7HBLA06/2020/0003/F · FullApproved0.9 mi
- Land to the rear of 122 Donaghadee Road, NewtownardsX/2005/1231/F · FullApproved0.9 mi
For applicants and trades
Contractors near this project
- Rba Electrical Services LtdLondonElectrical InstallationElectrical Engineering0.4 mi
- Adair & Milliken PartnershipElectrician0.5 mi
- Hamilton ElectricalElectrician0.7 mi
- BlueBuild Insulation LtdWall InsulationCavity Wall Insulation1.3 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.