Skip to content
Pre-applicationOnshore wind· SPD/2024/0059/PAN

Wind farm: located 400m southwest of 175 Gelvin Road within the…Plans, timetable and how to have your say

A regionally significant development in Northern Ireland in Causeway and Glens, NI Strategic Planning, Causeway Coast and Glens Borough Council. Regionally significant developments in Northern Ireland are decided by the Department for Infrastructure rather than the local council.

Free. We'll email you when it moves stage.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

Who decides, and how to have your say

Regionally significant developments in Northern Ireland are decided by the Department for Infrastructure rather than the local council.

Anyone can comment on the application through the Northern Ireland Planning Portal while it is being considered.

Our guide: how to have your say on a national infrastructure project.

The site

No boundary has been published yet; the dot marks the project's location.

What is proposed

Proposed Evishagaran Wind Farm Extension: A proposed extension to the operational Evishagaran Wind Farm (B/2013/0120/F) in Co. Derry/Londonderry comprising: up to 9no. three-bladed horizontal axis wind turbines, each up to a 150m maximum height above ground level; associated external electricity transformers; underground cabling; access tracks; turning heads; crane hardstandings and all ancillary works. The development also includes use of existing site entrance and access tracks.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.