Skip to content
Pre-applicationDams and reservoirs· WA010006

Teddington Direct River Abstraction (TDRA)

A nationally significant infrastructure project in Hounslow, Kingston, Kingston upon Thames, Richmond. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 99 hectares inside the published boundary.

What is proposed

a Tertiary Treatment Facility with a peak output of 75Ml/d of recycled water; a recycled water drop shaft and approximately 4.5km pipeline with intermediate shafts located between Mogden Sewage Treatment Works and the River Thames upstream of Teddington Weir terminating in an outfall structure in or adjacent to the River Thames; a river water intake structure sized to abstract a maximum of 75Ml/d, located upstream of the outfall structure, a drop shaft, raw water pipeline and connection shaft to the Thames Lee Tunnel.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.