Mid Moile Wind FarmPlans, decision and timeline
A section 36 consent in Scotland in Dumfries, South Ayrshire. Large electricity generating stations in Scotland (over 50 MW) are consented by the Scottish Ministers under section 36 of the Electricity Act 1989, not by the local council.
Free. We'll email you when it moves stage.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Approved
Who decides, and how to have your say
Large electricity generating stations in Scotland (over 50 MW) are consented by the Scottish Ministers under section 36 of the Electricity Act 1989, not by the local council.
Anyone can make a representation to the Scottish Government's Energy Consents Unit while the application is being considered. The planning authority is consulted, and if it objects a public inquiry is held.
Our guide: how to have your say on a national infrastructure project.
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,154 hectares inside the published boundary.
What is proposed
wind 99.4 MW + battery · Land at Mid Moile, Mid Moile, Stranraer
What the site overlaps
The published boundary doesn't overlap any of the protected areas, heritage sites or flood zones we map.
Overlaps the published boundary, which can include cable, pipe or road routes; it doesn't mean these areas would be built on. From the official datasets we hold for protected areas, heritage and flood risk.
Other national projects nearby
Projects within 10 km. Inspectors are asked to consider the combined effect of schemes close together.
- High Mark Wind Farm - Wind Turbines · Onshore wind · 1.0 km awaySubmitted
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.