ExaminationSolar farm· EN010169

Meridian Solar Farm

A nationally significant infrastructure project in Lincolnshire, South Holland. An independent panel is examining the application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,617 hectares inside the published boundary.

What is proposed

Meridian Solar Farm will comprise the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) and electrical battery storage generating facility with a generation capacity of up to 750MW. This will include the associated development and infrastructure required to facilitate a connection to the National Grid.

Linked planning applications

Council consultations, related applications and requirement sign-offs that quote this project.

  • EN010169 · NSIP England · 20 March 2026

    Meridian Solar Farm