Skip to content
DecidedSolar farm· EN010127

Mallard Pass Solar Project

A nationally significant infrastructure project in Rutland, South Kesteven, Lincolnshire. A decision has been made.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 853 hectares inside the published boundary.

What is proposed

Solar photovoltaic array and electrical storage and connection infrastructure, with a generation capacity of greater than 50 MW.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.