DecidedSolar farm· EN010152

Fenwick Solar Farm

A nationally significant infrastructure project in Doncaster, Harrogate, North Yorkshire, Selby. A decision has been made.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 514 hectares inside the published boundary.

What is proposed

The Scheme comprises the installation of solar photovoltaic (PV) generating panels, associated electrical equipment, cabling and energy storage facilities together with grid connection infrastructure. The generating capacity of the Scheme will exceed 50 MW and its maximum capacity is anticipated to be 237.5MW.