Dean Moor Solar Farm
A nationally significant infrastructure project in Allerdale, Copeland, Cumberland, Cumbria. A decision has been made.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 277 hectares inside the published boundary.
What is proposed
The Proposed Development comprises the construction, operation, and decommissioning of a solar energy generating station comprising solar PV arrays, an on-site grid connection, associated infrastructure, and green infrastructure with a total capacity exceeding 50 megawatts (MW). The Site is approximately 276.5ha The generating station would export electricity via an on-Site connection to the local Electricity North West Limited (as Distribution Network Operator (DNO)) grid network.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.