The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 644 hectares inside the published boundary.
What is proposed
Construction and operation of a new double circuit electricity transmission network reinforcement of c.29km, consisting of overhead lines, underground cables, a grid supply point substation and associated development.