Skip to content
Pre-applicationSolar farm· EN0110033

Arrow Valley Solar

A nationally significant infrastructure project in Bromsgrove Redditch, Stratford on Avon, Warwickshire, Worcestershire, Wychavon. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,763 hectares inside the published boundary.

What is proposed

A ground-mounted solar photovoltaic (PV) generating station with a capacity in excess of 100MW. The proposed development includes solar array areas and associated development including energy storage, grid connection infrastructure, and other infrastructure integral to the construction, operation, maintenance and decommissioning of the development.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.