The removal of 1no existing 300mm dish to be replaced with 1no. new 300mm dish on the existing face frame on the existing tower. Proposed link equipment tobe installed within the existing equipment cabin and all ancillary development thereto. The removal of 1no existing 600mm dish to be replaced with 1no. new 600mm dish on the existing face frame on the existing tower. Proposed link equipment to be installed within the existing equipment cabin and all ancillary development thereto