Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.