Planning Application Details - 26/0395/COND
Discharge condition 26 (SI stability) of planning consent 25/0342/NCC(Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
Application Details
- Reference
- 26/0395/COND
- Address
- Twyn Hywel Energy Park Land North-West Of Caerphilly
- Local Authority
- Caerphilly
- Application Type
- Conditions
- Scale / Size
- Small
- Status
- Undecided
Applicant & Agent
Agent Address: Ms L Hayward 2 Kingsway Cardiff CF10 3FD
Key Dates
- Date Received
- 2026-06-04
- Date Validated
- 2026-06-05
- Date Submitted
- 2026-06-04
- Target Decision Date
- 2026-07-31
Decision
- Decided By
- Delegated
- Case Officer
- See source
Additional Information
- Coordinates
- 51.672382, -3.1783938
Planning Constraints Identified
This application matches the following planning constraint categories:
- Flood & Drainage